3
Shared Docs
2
Same-Page
3 / 3
Mentions
d. All conducted. All Roof Inventory: #1:2; 757 75/5 Lieutenant. The fire alarm and sprinkler w/exception of Control Center Fire conducted via the Institution Public Radio. Restraint Equipment Cage inventory accounted for. Metal Detector checks w/the exception of Rear Gate/Facilities/R&D. completed. All secure
Page: EFTA00033693 →el. PREA Address System conducted. All conducted. All Roof Inventory: #1:2; 757 75/5 Lieutenant. The fire alarm and sprinkler w/exception of Control Center Fire conducted via the Institution Public Radio. Restraint Equipment Cage inventory accounted for. Metal Detector checks w/the exception of Rear
Page: EFTA00033693 →. All conducted. All Roof Inventory: #1:2; 765 75/5 Lieutenant. The fire alarm and sprinkler w/exception of Control Center Fire conducted via the Institution Public Radio. Restraint Equipment Cage inventory accounted for. Metal Detector checks w/the exception of Rear Gate/Facilities/R&D. completed. All secure
Page: EFTA00034806 →l. PREA Address System conducted. All conducted. All Roof Inventory: #1:2; 765 75/5 Lieutenant. The fire alarm and sprinkler w/exception of Control Center Fire conducted via the Institution Public Radio. Restraint Equipment Cage inventory accounted for. Metal Detector checks w/the exception of Rear
Page: EFTA00034806 →ing completed 3:00 AM Institution Count in progress 3:31 AM Good Verbal count announced 3:33 AM Clear Institution count announced 798 76/5 Note: Control Center Door Panel malfunctioning. Comm. Tech./Asst. Security Officer notified. Affected doors manually operated. 5:00 AM Institution Count in progress 5
Page: EFTA00034896 →ssumes duties as the Day Watch Operations Lieutenant. The fire alarm and sprinkler system are operational. Unable to conduct PREA announcement over the Institution Public Address System, due to, system malfunction. Restraint Equipment Cage inventory conducted. All equipment accounted for. Metal Detector checks conduct
Page: EFTA00034897 →Entities connected to both the Institution Public and Control Center