6
Shared Docs
6
Same-Page
6 / 6
Mentions
ch Update from 11/21 AM Heat pumps- working well at Main House. Hughes Net - BG signed up today, install after Thanksgiving but before you arrive. Dakota Well- RK has proposal to review with you 11/22. Pool Control - vendor and product selected, RK to review with you/order 11/22. Sony - did respond f
up order on parts ordered, to be on site now 11/25. Per RK Crestron work onsite 12/2. Zorro Ranch Update from 11/21 AM Heat pumps- working well at Main House. Hughes Net - BG signed up today, install after Thanksgiving but before you arrive. Dakota Well- RK has proposal to review with you 11/22. Pool Co
d for NY. 2 EFTA00577546 ESTATE PROGRESS REPORT - SEPTEMBER 26.2003 LOCATION COMMENT NEXT ACTION BY DATE BY REVISED DATE Water Issues — Dakota Well 1. MBI on site Sept 26 to attempt one last repair on 10,000.00 gallon tank. Results known after tank fills with water by Sept 27. 2. Fencing
n eating ram sculpture" to be placed on table outside LR by Oct 3. 3. JE to advise location of rugs on next visit. Karen Karen JE 10;'3 10;'3 Main House Water Treatment Proposals on site. 66-page proposal submitted. Proposal sent to Darren for his review. G — Darren wasn't in today. Pool - Pool H
tiles x) Custom tiles will be delivered by April 21. + NC 11. Water Rights 12. Phase Power/Water Well xi) Shannon has received notice for the Dakota well application from the Office of the State Engineer. Approximately one half of the power line installation has been completed. 4 Update 13. "
Complete. + NC 7. 40 Ft Digital Screen vii) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. 4 Update 8. Main House lutron system not working properly. viii) Completed. 4 4 NC JE to advise 9. Repeaters for MH Cell hone & Radio ix) Repeater costs $4K. Ins
tiles x) Custom tiles will be delivered by April 21. + NC 11. Water Rights 12. Phase Power/Water Well xi) Shannon has received notice for the Dakota well application from the Office of the State Engineer. Approximately one half of the power line installation has been completed. 4 Update 13. "
Complete. + NC 7. 40 Ft Digital Screen vii) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. 4 Update 8. Main House lutron system not working properly. viii) Completed. 4 4 NC JE to advise 9. Repeaters for MH Cell hone & Radio ix) Repeater costs $4K. Ins
kitchen tiles xiv) Tiles will be completed by 21 April + NC 11. Water Rights 12. Phase Power/Water Well xv) Shannon has received notice for the Dakota well application from the Office of the State Engineer. xvi) Approximately one half of the power line installation has been completed. 13. "Z" to
Complete. + NC 7. 40 Ft Digital Screen xi) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. + Update 8. Main House lutron system not working properly. xii) Completed. 9. Repeaters for MH Cellphone & Radio Coverage xiii) The repeaters would run approx. $4,0
D DATE Ranch Vehicles NY Suburban to be sent to Zorro & 2004 Suburban to be purchased for NY. Delivery expected beginning of Dec Water Issues — Dakota Well 1. MBI on site Sept 26 to attempt one last repair on 10,000.00 gallon tank. Results known after tank fills with water by Sept 27. 2. Fencing
Oct 3. 2. "Lion eating ram sculpture" to be placed on table outside LR by Oct 3. 3. JE to advise location of rugs on next visit. 10/3 10.'3 JE Main House Water Treatment Proposals on site. 66-page proposal submitted. Proposal sent to Darren for his review. Pool - Pool Heater New Pool Heater on si
Entities connected to both Dakota and Main House

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Ghislaine Maxwell
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSONDarren Indyke
PERSONBrice Gordon
PERSON
Oliver Stone
PERSON
Samantha Power
PERSON
Zorro
LOCATION
George W. Bush
PERSONLeon Black
PERSON
Alan Dershowitz
PERSONRanch
ORGANIZATIONEmad Hanna
PERSONLarry Visoski
PERSONNanna
PERSON
Robert Gates
PERSON
Eric Trump
PERSON
Albuquerque
LOCATION