4
Shared Docs
4
Same-Page
4 / 4
Mentions
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. M
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5/31. Carlos will take the vehicle to Guardian 5/30 for adjuster's inspection.
5125. Concrete pour TBD. JE advise *H" to be Bigger. JE to review 6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approva
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5131. Carts will take the vehicle to Guardian 5/30 for adjuster's Inspection. P
) Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'H" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -eviewed and approved drawings 5/22. approval and sign off of the plans will be sent to Buck
5). A complete service was performed on the Denali and the rear brake pads changed jaMvill schedule the hose install once the part arrives. ill aw Insurance Coverage & Repairs to he made ailing estimate from Cliffs Auto Repair - by 5/31. Carlos wi I to e t e vehicle to Guardian 5/30 for adjusters inspection. Pools & Pow
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'fri" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. Weviewed and approved drawings 5/22.. approval and sign off of the plans will be sent to Buck
iness days (6/5). A complete se-vice was performed on the Denali and the rear brake pads changed. schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. awaiti etsotimate from 011is Auto Repair - by 5/31. will take the yeni ns e Guardian 5/30 for adjuster's inspection. Pods & Power Wa
Entities connected to both Allied and Insurance Coverage & Repairs

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Carlos
PERSONLeon Black
PERSON
Samantha Power
PERSON
Richard Kahn
PERSON
Julie K. Brown
PERSONYacht
ORGANIZATION
Oliver Stone
PERSONDaphne Wallace
PERSON
Prince Charles
PERSON
Palm Beach
LOCATION
Robert Gates
PERSON
Joi Ito
PERSON
Condoleezza Rice
PERSON
Sergey Brin
PERSONFlanders
LOCATIONNautica
ORGANIZATION
Caterpillar
ORGANIZATIONBench
ORGANIZATION