4
Shared Docs
4
Same-Page
4 / 4
Mentions
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. M
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
) Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'H" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -eviewed and approved drawings 5/22. approval and sign off of the plans will be sent to Buck
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'fri" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. Weviewed and approved drawings 5/22.. approval and sign off of the plans will be sent to Buck
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
5125. Concrete pour TBD. JE advise *H" to be Bigger. JE to review 6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approva
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Allied and Tropical Shipping STT

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Carlos
PERSON
Samantha Power
PERSON
Richard Kahn
PERSONLeon Black
PERSON
Julie K. Brown
PERSONYacht
ORGANIZATIONDaphne Wallace
PERSON
Oliver Stone
PERSON
Prince Charles
PERSON
Palm Beach
LOCATION
Robert Gates
PERSON
Joi Ito
PERSON
Caterpillar
ORGANIZATIONInsurance Coverage & Repairs
ORGANIZATIONPanels
ORGANIZATIONGSJ Terrace
ORGANIZATIONNautica
ORGANIZATIONMB Bath
ORGANIZATION