Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. M
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
) Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'H" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -eviewed and approved drawings 5/22. approval and sign off of the plans will be sent to Buck
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'fri" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. Weviewed and approved drawings 5/22.. approval and sign off of the plans will be sent to Buck
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
5125. Concrete pour TBD. JE advise *H" to be Bigger. JE to review 6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approva
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both Allied and Christmas Cove Service Dock

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Carlos
PERSON
Samantha Power
PERSONLeon Black
PERSON
Richard Kahn
PERSON
Julie K. Brown
PERSONYacht
ORGANIZATIONDaphne Wallace
PERSON
Oliver Stone
PERSON
Prince Charles
PERSON
Palm Beach
LOCATION
Robert Gates
PERSON
Joi Ito
PERSON
Caterpillar
ORGANIZATIONInsurance Coverage & Repairs
ORGANIZATIONPanels
ORGANIZATIONGSJ Terrace
ORGANIZATIONNautica
ORGANIZATIONMB Bath
ORGANIZATION