4
Shared Docs
4
Same-Page
4 / 4
Mentions
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. M
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
) Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'H" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -eviewed and approved drawings 5/22. approval and sign off of the plans will be sent to Buck
n Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5131. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, of-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dire
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'fri" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. Weviewed and approved drawings 5/22.. approval and sign off of the plans will be sent to Buck
m Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units arrived at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. =will schedule barge to pick up direc
5125. Concrete pour TBD. JE advise *H" to be Bigger. JE to review 6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approva
urn Fuel truck into Flatbed The (3) 2019 Polaris Ranger EV units amved at vendor 5/23. Will be sent for undercoating (Rust proofing process) 5/31. John Deere does not manufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up dir
Entities connected to both Allied and John Deere

Jeffrey Epstein
PERSON
Marc Rich
PERSONLeon Black
PERSON
Samantha Power
PERSON
Oliver Stone
PERSON
Carlos
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONAnn Rodriquez
PERSON
Richard Kahn
PERSON
George W. Bush
PERSONDaphne Wallace
PERSON
Julie K. Brown
PERSONYacht
ORGANIZATIONLarry Visoski
PERSON
Robert Gates
PERSON
Palm Beach
LOCATION
Prince Charles
PERSON
Atlanta
LOCATION
Joi Ito
PERSON