Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise ' to to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -n 25 Wreckshop Michael & Bill Terry 40x60 Bid. JB reviewed and approved drawings 5/22. M
t on each side of the centered 3ft wide door. Materials needed to skin the gate frame Materials needed to skin the gate frame Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Page 5 al 18 O EFTA01309500 LZ550Z00 -Vida
) Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'H" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. -eviewed and approved drawings 5/22. approval and sign off of the plans will be sent to Buck
ded to skin the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. working on this. Should have better idea 931 of completion date. LSJ Dock Exported on June 9. 2019 9:33:34 PM ROT Pag
Forms and lighting installation complete by 5/25. Concrete pour TBD. JE advise 'fri" to be Bigger. JE to review 6/5 Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. Weviewed and approved drawings 5/22.. approval and sign off of the plans will be sent to Buck
n the gate frame 56 LSJ Helipad Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior._ working on this. Should have better idea 5/31 of completion date. Exported on June 9,2019 9:33:34 PM BOT Page S of 18
5125. Concrete pour TBD. JE advise *H" to be Bigger. JE to review 6/5 24 LSJ Tunnel Michael & Bill Terry Skin it Re-Skin the Tunnel. Quote from Allied. Waiting on Buck Steel. Recommend going with Allied. 25 Wreckshop Michael & Bill Terry 40x60 JB reviewed and approved drawings 5/22. MG approva
ester & James Heli Service Gate Materials needed to skin the gate frame 57 LSJ Dock Mike & Brian Bates Water Sport Dock Box Build Dock Box with Bench similar to Yacht interior. Brian working on this. Should have better idea 5/31 of completion date. Exported on June 9. 2019 9 33 34 PM 6O1 Page 5
Entities connected to both Allied and Bench

Jeffrey Epstein
PERSON
George W. Bush
PERSON
Marc Rich
PERSONLeon Black
PERSON
Carlos
PERSON
Samantha Power
PERSON
United States
LOCATION
Richard Kahn
PERSON
Julie K. Brown
PERSON
Ghislaine Maxwell
PERSONDaphne Wallace
PERSONYacht
ORGANIZATION
NEW YORK NY
LOCATION
Joi Ito
PERSON
Oliver Stone
PERSON
Condoleezza Rice
PERSON
Robert Gates
PERSON
Prince Charles
PERSON
Prince Andrew
PERSON
Vicky Ward
PERSON