ICE AND ADMINISTRATIVE MATTERS • Site Management: Tom Melnick continues to manage construction on the island and Bill Rowles continues to oversee. Gary Kerney is now head of all construction and design. II. Communications and Coordination: Systems in and out, being corrected. Still not 100%. No fax capabi
mpleted. ■ Millwork installation completed with the crew they have. Mr. Fancelli arrived to inspect the work. Meeting on site Saturday 6/20/09 with Fancelli, Molyneux and Doug Schoettle. Awaiting direction. IV. Fit up, Finish and Envelop work: ■ EIFS scope being revised- plans and specifications for r
al roofing topcoat paint - Contract out to Bluestone Services. Work is 50% completed. ■ Millwork installation completed with the crew they have. Mr. Fancelli arrived to inspect the work. Meeting on site Saturday 6/20/09 with Fancelli, Molyneux and Doug Schoettle. Awaiting direction. IV. Fit up, Finish a
2O1 WORK APPRoval Mot .nen..: Stud° St. Limes (sr ICE Fotloicing the on Site meeting March 2.2*: - 23-; 2010, among: The client RePresentative Gary Kerney, Molyneux Studtol JuanPablo Molyneux.0P6 t MciaS Fancelli Panehng: Jean Pierre Fanelli, 4 (s Etib7, t( -&)(..-6...0 In regard of the tittle Sa
st to you. This means that you will not be responsible for any Fancelli Installer expenses including travel, lodging, food, incidentals, etc. After Fancelli finishes the Installation., I will decide if the color of the paneling is adequate for the overall ambiance. If It Is not, I will select color with
Request Riplace bamboo mash at all cabinet dos* with metal mesh In a dark color that will not rust. Status: New metal grilles are not in agreement 'Fancelli has repaired damaged grilles and will provide 8 new framed grilles for future use. 01901 — Punch List — Item #10 ••••••••••••616 • • Damaged bam
From: Jeffrey Epstein <[email protected]> To: Gary Kerney <1 Subject: Fwd: LSJ Office Building Finishes Date: Tue, 14 Jul 2009 19:07:37 +0000 Forwarded message From: Doug Schoettle Date: Tue, Jul
as a detail for the ceiling frame at the center of the ceiling of the office. Has he received the leather sample for the panels. We also await the Fancelli proposal for additional woodwork at the entry doors and the cabined doors at each end of the room. We really need to do the floor as soon as possibl
re to be stained darker so as not to appear orange when the shelf lights are on. Status: Two alternate finishes have been produced on site. JPN1 and Gary Kerney do not recommend changing the Interior finish. 01901 — 1?ttitch List — Item #17 18 EFTA00299553 JP MOLYNEUX STUDIO LTD. Ii • A4! Approved y .
al project - a library - in mind. He seemed vague as to details, so I asked him to send plans. He said he did not have any, but wanted to visit the Fancelli showroom. I set an appointment with him for November 29, 2010 at 5:3015. 4. On November 29, 2010, Charles Oregano called again to make sure that I
Entities connected to both Gary Kerney and Fancelli

Jeffrey Epstein
PERSONBrice Gordon
PERSONDoug Schoettle
PERSONDarren Indyke
PERSON
Marc Rich
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSON
Lesley Groff
PERSONWilliam Rowles
PERSON
Saint James
LOCATIONMaria Farmer
PERSON
George Mitchell
PERSONLarry Visoski
PERSONLeon Black
PERSON
Prince Andrew
PERSON
Prince Charles
PERSON
Woody Allen
PERSON
FedEx
ORGANIZATION
Puerto Rico
LOCATIONEscorial
LOCATION