4
Shared Docs
4
Same-Page
5 / 4
Mentions
he delivery to Little St. James of the woodworking materials and tools required for Fancelli to complete its installation was very unrealistic. Mr. Schoettle also advised that Fancelli should schedule its installation on Little St. James for early January, rather than late December. In response, by email
have arisen in connection with the performance of the Agreement for Design Services between our clients. First, by email dated November 18, 2009, Doug Schoettle advised Laurin Goff of JP Molyneux Studio that the short timeline provided by your clients for the delivery to Little St. James of the woodworking
ue Suite 2020 New York, NY 10177 Re: Design Services Agreement dated May 15, 2009 by and among Juan Pablo Molyneux, J.P. Molyneux Studio, Ltd., L.S.J., LLC and Jeffrey Epstein Dear Jay: I write to inform you about two important and time-sensitive issues which have arisen in connection with the pe
Site Excavation at RO/Mechanlcal Building A CZM permit has been Issued for the sitework at this site. It can be begun immediately. At the urging of Doug Schoettle and Dan Chipman the team believes that the initial phase of this work, i.e. erosion control, the excavation of material, and removal and storage on
uarters Suite A2.7, USVI 00802 EQUIPMENT LEASE THIS AGREEMENT (the Agreement) made 07 January, 2008 between Lafayette Contractors, LLC as agent for L.S.J., LLC (the Lessee) and Alain Gifford; DBA Blessed Trucking, Nisky Mail Boxes P.M.B. #630, St. Thomas, VI 00802 (the Lessor). WITNESSETH, that the Le
ity of the services and items your clients are required by the DSA to provide remain outstanding. For almost three weeks now, LSJ's representative, Doug Schoettle, has been emailing JP asking for JP to provide a schedule for the Fancelli cabinetmakers to travel to Little Saint James island to complete the ins
ue Suite 2020 New York, NY 10177 Re: Design Services Agreement dated May 15, 2009 by and among Juan Pablo Molyneux, J.P. Molyneux Studio, Ltd., L.S.J., LLC and Jeffrey Epstein Dear Jay: I write to you in order to prevent what could soon become a breach by your clients of their obligations under t
Document #013 Sent from my Blacknerry wireless device From: Doug Schoettle Date: Wed, id—iiaivZele 0?:58:56 -0800 (PST) To: [email protected]> • Cc: <'eevacati il_com›; Rowles<w Subject: Fanc nch List FAHCELLI PUNCH
into this 15th day of May, 2009, by and among Juan Pablo Molyneux ("JP"), J.P. Molyneux Studio, Ltd. ("Studio', and together with JP, "Molyneux,") L.S.J., LLC ("LSI") and JeffLeLEpstein ("Epstein"-)r _Each-of-the-partter hereto ((the 'Pardee), intending to be bound hereby, hereby agrees as follows;
Entities connected to both Doug Schoettle and L.S.J.

Jeffrey Epstein
PERSONDarren Indyke
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Lesley Groff
PERSONEmad Hanna
PERSON
Ghislaine Maxwell
PERSON
U.S. Virgin Islands
LOCATION
Michael Douglas
PERSONFancelli
PERSON
Palm Beach
LOCATIONLarry Visoski
PERSON
Condoleezza Rice
PERSON
Saint James
LOCATION
David Rodgers
PERSON
Alfredo Rodriguez
PERSON
United States
LOCATIONJuan Pablo Molyneux
PERSON
George Mitchell
PERSONMaria Farmer
PERSON