MMENT 4 Update 1. AC in master bedroom. Air volume to be increased and diffusers to be changed. i) Diffusers will begin installation 15 April. Serge was told the AC does not heat the room below 72 degrees. In conjunction with the new apartment, the air conditioner in the MBR will be looked into.
t quantity of tiles = 1,631 tiles. Attached is the proposal, please advise. Drawings expected by Pascal April 25. + NC 4. Plumbing in Shed. iv) Miller Bonded have completed their project until the power is turned on in April/May. 4 Update 5. Building for RO v) Ionics installation is scheduled by May 9
r work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update + + 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update + 14.5 x
COMMENT + Update 9. Survey xi) All easements were resent to all families 10 Oct as Darren made changes. + Update 10. Electricity Plumbing xii) Miller Bonded have started the piping in the water pump building — completion expected 15 Dec. xiii) , t plate 11. Building for RO xiii) Building is up and ne
MMENT 4 Update 1. AC in master bedroom. Air volume to be increased and diffusers to be changed. i) Diffusers will begin installation 15 April. Serge was told the AC does not heat the room below 72 degrees. In conjunction with the new apartment, the air conditioner in the MBR will be looked into.
t quantity of tiles = 1,631 tiles. Attached is the proposal, please advise. Drawings expected by Pascal April 25. + NC 4. Plumbing in Shed. iv) Miller Bonded have completed their project until the power is turned on in April/May. 4 Update 5. Building for RO v) Ionics installation is scheduled by May 9
r work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update + + 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update + 14.5 x
COMMENT + Update 9. Survey xi) All easements were resent to all families 10 Oct as Darren made changes. 4 Update 10. Electricity Plumbing xii) Miller Bonded have started the piping in the water pump building — completion expected 15 Dec. xiii) + Update 11. Building for RO xiii) Building is up and new
m Pinto expected 15 Nov EFTA00577803 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 14.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update 15.5 x B/W
COMMENT * Update 9. Survey xi) All easements were resent to all families 10 Oct as Darren made changes. + Update 10. Electricity Plumbing xii) Miller Bonded have started the piping in the water pump building — completion expected 15 Dec. + Update 11. Building for RO xiii) Building is up and new door (
ule for work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update I4.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update 15.5 x B/W
0 Oct as Darren made changes. EFTA00577833 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 10. Electricity Plumbing xii) Miller Bonded have started the piping in the water pump building — completion expected 15 Dec. + Update 11. Building for RO xiii) Building is up and new door (
Entities connected to both Serge and Miller Bonded

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSON
Marc Rich
PERSONDarren Indyke
PERSON
Alan Dershowitz
PERSONPascal
PERSONLarry Visoski
PERSON
Samantha Power
PERSON
Oliver Stone
PERSON
Zorro
LOCATION
Puerto Rico
LOCATIONBastion
ORGANIZATIONMiles
PERSONAC Units
ORGANIZATIONPinto
PERSONBoudoir
LOCATION
Prince Charles
PERSON
Hawaii
LOCATIONValdson Cotrin
PERSONJE sd
ORGANIZATION