From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 19:40:49 +0000 on builiding b can we have a flat roof? On Wed, Apr 22, 2015 a
ve a flat roof? On Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace <1 Greetings Sir, Revisions from John for your review and comments. Respectfully, Daphne Forwarded message From: John P. Woods, AIA Date: Wed, Apr 22, 2015 at 2:03 PM Subject: R.O. & Generator Bld . Revisions To: Da hne Wallace , C
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: I. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
in the area. I am also concerned about having enough maneuverability to take the dump bins in and out if the building is made wider. Respectfully, Daphne On Wed, Apr 22, 2015 at 2:38 PM, Jeffrey E. <[email protected]> wrote: page 9 elevaion is wrong shoudl extend past teh wall On Wed, Apr 22, 20
From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 20:21:02 +0000 ok but what about a flat roof On Wed, Apr 22, 2015 at 4:19 PM,
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
ightly sloping shed, subject to the building's manufacturer. We can design it and show the steel building manufacturer what you want. Respectfully, Daphne On Wed, Apr 22, 2015 at 2:40 PM, jeffrey E. <[email protected]> wrote: on builiding b can we have a flat roof? On Wed, Apr 22, 2015 at 3:14 PM
From: "Jeffrey E." <[email protected]> To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions Date: Wed, 22 Apr 2015 20:40:48 +0000 i suggest that as we are taking down the current shed can we fl
mments from Mr. Epstein at a recent site visit on Friday, April 17, 2015. In summary, the changes requested are as follows: 1. The longer building (R.O. Bldg.) will be expanded to a width of 60 feet. There will be roll up doors on both of the short ends. The two long sides will have no openings. The exter
te= wall O= Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallace < wrote: Gree=ings Sir, Revisions from John for your review and comme=ts. Respectfully, Daphne Forwarded message From: John P. Woods, AIA < Date: Wed, Apr 22, 2015 at 2:03 PM Subject: R=O. & Generator Bldg. Revisions To: Daphne Wallace <
From: jeffrey E. <[email protected]> Sent: Wednesday, April 22, 2015 7:39 PM To: Daphne Wallace Subject: Re: R.O. & Generator Bldg. Revisions page 9 elevaion is wrong shoudl extend past te= wall O= Wed, Apr 22, 2015 at 3:14 PM, Daphne Wallac
ents from Mr. Epstein at a recent site visit on Friday, April 17, =015. In summary, the changes requested are as follows: 1. * The longer building (R.O. Bldg.) will be expand=d to a width of 60 feet. There will be roll up doors on both of the short =nds. The two long sides will have no openings. The exter
Entities connected to both Daphne Wallace and R.O. Bldg