5
Shared Docs
5
Same-Page
5 / 5
Mentions
as will be installed in place of existing. T1 Phone service and Data services will use=new link, Please note during this time Phone Services to the Ranch will be d=srupted. <=div> Centurylink There is an issue =ith the Fiber Install on Sandia Crest. The initial install entailed laying 6-8 ft of co
Nevada Towers. The Tower owner has indicated the existing conduit has been badly dama=ed and there will be a need to lay a new run of conduit from Dmark to his =uilding. (40' rigid buried and 140' above ground galvanized condui=.), Sierra Nevada have indicated a Estimated Cost of $4500.00, with aiv c
ned, New Antennas will be installed in place=of existing. T= Phone service and Data services will use new link, Please note during this timeto the Ranch will be disrupted. Centurylink There is an issue with the Fiber Install on Sandia=Crest. The ini=ial install entailed laying 6-8 ft of conduit fro
Nevada Towers. The Tower owner has indicat=d the existing conduit has been badly damaged and there will be a need to =ay a new run of conduit from Dmark to his building. (40' rigid buried =nd 140' above ground galvanized conduit.), Sierra Nevada have indicate= a Estimated Cost of $4500.00, with work
as will be installed in place of existing. T1 Phone service and Data services will=use new link, Please note during this time Phone Services to the Ranch will =e disrupted. <=r> Centurylink=/div> EFTA_R1_01562649 EFTA02458316 There is an is=ue with the Fiber Install on Sandia Crest. The initial
Nevada Towers. The Tower owner has indicated the existing conduit has been badly =amaged and there will be a need to lay a new run of conduit from Dmark to =is building. (40' rigid buried and 140' above ground galvanized co=duit.), Sierra Nevada have indicated a Estimated Cost of $4500.00, with work
as will be installed in place of e=isting. T1 Pho=e service and Data services will use new link, Please note during this time Phon= Services to the Ranch will be disrupted. Centurylink There is an issue with the Fiber Install on Sandia Cre=t. The initial=install entailed laying 6-8 ft of conduit fro
Nevada Towers. The Tower owner has indicated =he existing conduit has been badly damaged and there will be a need to lay=a new run of conduit from Dmark to his building. (40' rigid buried and=140' above ground galvanized conduit.), Sierra Nevada have indicated a=Estimated Cost of $4500.00, with work
time of phone service during install of ne= Microwave link. The bes= they can do is Sl=de the existing T1 link down the tower on Sandia Crest and Ranch, re=stablish service this will take tw= days and 4 men, cost $6800.00, /down time 2 =ays instead of 5 days once new link is installed, decommission
Nevada Towers. The Tower owner has indicated the existing conduit has been badly=damaged and there will be a need to lay a new run of conduit from Dmark to=his building. (40' rigid buried and 140' above ground galvanized c=nduit.), Sierra Nevada have indicated a Estimated Cost of $4500.00, withq=iv>
Entities connected to both Ranch and Dmark

Jeffrey Epstein
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSON
Zorro
LOCATION
Marc Rich
PERSONBrice Gordon
PERSONMain House
ORGANIZATIONCenturylink Demark
PERSON
Tower
ORGANIZATIONSierra Nevada Towers
ORGANIZATIONPhone Services
ORGANIZATION
Samantha Power
PERSONSierra Nevada
ORGANIZATIONMicrowave Link
ORGANIZATIONNew Antennas
ORGANIZATIONthe Fiber Install
ORGANIZATION