8
Shared Docs
8
Same-Page
8 / 8
Mentions
Shooting Range, which is no longer in use. The cost of development at this location will be far less than the location I originally had in mind.The Ranch can utilize the present Infrastructure for Well 6 and Dakota Pumping Station It will require laying pipe, some valve and bull head adjustments, whi
h would be completed by Ranch personal. This location would also address your concerns regarding, odor, mosquitos and wildlife being to close to the Main House Please Note the Following: The estimated cost of just a Basic Pond in a location close to the POU is estimated at SII3,000.00, this does not includ
The, 09 May 2017 13:56:45 +0000 I'm sure! I want to see pictures!!! > On May 9, 2017, at 8:55 AM, Zorro < > wrote: > Shame you could not make it, Ranch is really pretty at this time of the year > Wedding is differently keeping everyone busy > All the best > • Zorro Management LLC > 49 Zorro Ranc
>>>> >>>>> On May 8, 2017, at 7:18 PM, Zorro < > wrote: >>>>> >>>» Hi Lesley >>>>> Can you confirm where JE would like the guests 4,5,6 to stay Main House, Lodge? >>>>> Thanks >>>>> MIMEO >>>» >>>» >>>>> Zorro Management LLC >>>>> 49 Zorro Ranch Rd >>>>> Stanley, NM EFTA00450702 >>>>> >>>>> R
etgmail.com] From: Zorro Ranch Sent Fri 10/8/2010 7:35:50 PM Subject: Guests-Ranch Good afternoon, In reference to your guests arriving at the Ranch today - do they have access to the Main House - Pool etc? Please advise Thank you Warmest regards Karen Zorro Development, Inc. zorro.office@gm
ri 10/8/2010 7:35:50 PM Subject: Guests-Ranch Good afternoon, In reference to your guests arriving at the Ranch today - do they have access to the Main House - Pool etc? Please advise Thank you Warmest regards Karen Zorro Development, Inc. [email protected] EFTA_R1_01484086 EFTA02418656
as will be installed in place of existing. T1 Phone service and Data services will use=new link, Please note during this time Phone Services to the Ranch will be d=srupted. <=div> Centurylink There is an issue =ith the Fiber Install on Sandia Crest. The initial install entailed laying 6-8 ft of co
ss="gmail_default" style="font-size:small">Future Tech are sche=uled to be on sight July 31st for the install of Microwave Link from Sandi= Crest to Main House. Install of Link is expected to take 5 to 7 days There have some changes to the initial desig=. Due to engin=ering and tower owner concerns, the e
l be installed in place of existing.</=iv> T1 Phone service and Data services will =se new link, Please note during =his time Phone Services to the Ranch will be disrupted. EFTA_R1_01562430 EFTA02458152 Centuryli=k There is an issue with the Fiber Ins=all on Sandia Crest. The initial insta=l enta
ime 2-4 hrs. [email protected]> wrote: ok for sierra, but cannot have p=one disruption On Fri, Jul 8, 2016 at 2:33 PM, Brice Gordon > wrote: Main House. Jeffrey Future Tech are scheduled=to be on sight July 31st for the install of Microwave Link from Sandia Cre=t to Install of Link is ex=ected to
as will be installed in place of existing. T1 Phone service and Data services will=use new link, Please note during this time Phone Services to the Ranch will =e disrupted. <=r> Centurylink=/div> EFTA_R1_01562649 EFTA02458316 There is an is=ue with the Fiber Install on Sandia Crest. The initial
gmail.=om> wrote: ok for sierra, but c=nnot have phone disruption <=r> On Fri, Jul 8, 2016 at 2:33 PM, Brice Gordon =span dir="ltr">< > > wrote: Main House. =effrey Future Tech are s=heduled to be on sight July 31st for the install of Microwave Link from Sa=dia Crest to Install of Link is expected to
as will be installed in place of e=isting. T1 Pho=e service and Data services will use new link, Please note during this time Phon= Services to the Ranch will be disrupted. Centurylink There is an issue with the Fiber Install on Sandia Cre=t. The initial=install entailed laying 6-8 ft of conduit fro
EFTA02458651 =k for sierra, but cannot have phone disruption <mailto On Fri Jul 8= 2016 at 2:33 PM, Brice Gordon > wrote:=br> Sandia Crest to Main House. decommissioned, Jeffrey Future Tech are scheduled to be on sight July 31st for the i=stall of Microwave Link from Install of Link is expected to
time of phone service during install of ne= Microwave link. The bes= they can do is Sl=de the existing T1 link down the tower on Sandia Crest and Ranch, re=stablish service this will take tw= days and 4 men, cost $6800.00, /down time 2 =ays instead of 5 days once new link is installed, decommission
M, Brice Gordo= > wrote: Jeffrey adiv> Future Tech are=scheduled to be on sight July 31st for the install of Microwave Link from =andia Crest to Main House. Install of Link is expected to take 5 to 7 days There have some changes to the initial =esign. Due to =ngineering and tower owner concerns, the e
Entities connected to both Ranch and Main House

Jeffrey Epstein
PERSON
Condoleezza Rice
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Zorro
LOCATIONDarren Indyke
PERSONBrice Gordon
PERSONLarry Visoski
PERSON
Jes Staley
PERSON
Lesley Groff
PERSON
Zorro Ranch
LOCATION
Ghislaine Maxwell
PERSON
Albuquerque
LOCATION
Bella Klein
PERSONCenturylink Demark
PERSON
Tower
ORGANIZATION
Lawrence Krauss
PERSON
Samantha Power
PERSON
George W. Bush
PERSONDmark
ORGANIZATION