8
Shared Docs
8
Same-Page
8 / 8
Mentions
/2014 80% Marine Boats Kamoy Clean all boats. 11/13/2014 100% Marine Nana Guy Clean R/O Intake Pump. 11/14/2014 100% Marine Main Dock Carlos Purchase new fenders for Main Dock. Marina Main Dock Box Carlos Order or Buy new plastic rollin shelves for inside Dock box. Marine Main Dock
IPMENT PUNCH LIST Department Item Who Description Completion Status Date Mechanical Mechanic Shop Angel 8, Tap Fix Main Generator. Sent to Subbase to get part repaired 11/17/14 50% Mechanical Mechanic Shop Angel & Tap Fix Red Kawasaki that flipped. Parts ordered should arrive 11/21 at STC
y can fit us into their storage area. Liza is working on it and should have more info on storage fee in about an hour Our only other option is for Carlos to take it to Virgin Gorda this afternoon but I don't think the Barge is capable of that run due to bad weather, worn seals on steering shaft, water
e morning to add more straps and ropes to secure Big N as much as possible Gene was insisting that Big N needed to leave today so they could secure Subbase My Dock. mageljpegaimage2jpegglimage3jpeg<image4jpeg><image5jpeg>2,image6jpeg;,,image7jpeg image8jpegaimage9jpegglimagel0jpeg Ann R. On Sep 3, 20
521,190/Shelving $1,125) Total cost = $92,347.89 (Estimate - you noted there may be additional charges on L.51 accounts by Kassner that you/Danny/Carlos have not confirmed to date) Over budget = $38,704.89 (Estimated) Kind regards, DW *********************************************************** Th
ings B, As promised, please find attached the spreadsheet of cost to date for the Big N Repairs project. In summary, Original budget = $53,648.00 (Subbase Drydock $30,538/Diversified Yacht (PR) $11,500/Materials&Shipping $4,430/Labor $7,180) Paid to date = $70,037.89 (see sheet for details) left to
er $21.190/Shelving $1.125) Total cost = $92,347.89 (Estimate - you noted there may be additional charges on LSJ accounts by Kassner that you/Danny/Carlos have not confirmed to date) Over budget = $38,704.89 (Estimated) Kind regards, DW EFTA_R1_00461974 EFTA01976054
ings B, As promised, please find attached the spreadsheet of cost to date for the Big N Repairs project. In summary, Original budget = $53,648.00 (Subbase Drydock $30.538/Diversified Yacht (PR). $11.500/Materials&Shipping $4.430/Labor $7.180) Paid to date = $70,037.89 (sec sheet for details) Left to
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis - Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution - Dock boxes - struts should all be replaced-they are alltiflOM - Swim Ladder— direction from JE on placement required 10.
o negotiate pricing - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at AYH dock — Brice contacting Subbase for quote on completion of punch list items — Brice also reviewing bids from "Jersey Bob" and Island Riggings and Hydraulics - Inside cleaning 3 da
From: Ann Rodriquez Sent: Tuesday, Septemer.Mi l l 1 To: Richard Kahn Cc: Daphne Wallace; Jeffrey E. Subject: Re: Big N Update Carlos and I are going down tomorrow m=rning to take pictures of Big N, I'll speak with Gene in the morning and in=orm him of our negotiated price of 260k.
s week. We checked i=to polishing the existing fuel, but it is not cost effective or worth the r=sk of contaminating the new tanks. </=pan> LSJ or Subbase will need to order and a=range delivery of 200 gallons of fuel - please let us know if you would lik= us to handle this. If your prefer to order it,
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis - Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution - Dock boxes — struts should all be replaced — they are all backward - Swim Ladder— direction from JE on placement required
o negotiate pricing - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at AYH dock — Brice contacting Subbase for quote on completion of punch list items — Brice also reviewing bids from "Jersey Bob" and Island Riggings and Hydraulics - Inside cleaning 3 da
- Jet ski bumpers — complete — reviewing whether this type resolves the issues with the jet skis - Table/Dock Box - Dock box top to be revarnished — Carlos has a possible solution - Swim Ladder — direction from JE on placement required - Dive Platform — require construction details 10. Chillax Room —
ts - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at Subbase — work began 8/28 — due to splash 9/4, in house work to begin - Little C — engine at Offshore 8/29 — installation complete by 9/4 14. Timers - Rev
Entities connected to both Carlos and Subbase

Jeffrey Epstein
PERSONAnn Rodriquez
PERSON
Richard Kahn
PERSON
Alfredo Rodriguez
PERSON
Marc Rich
PERSONDaphne Wallace
PERSONJermaine Ruan
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONLeon Black
PERSONBarge
PERSONKaren
PERSONCecile de Jongh
PERSONBosco
PERSONLexington
LOCATIONBig N
ORGANIZATION
Robert Gates
PERSON
Oliver Stone
PERSON
Samantha Power
PERSONMaria Farmer
PERSON