4
Shared Docs
4
Same-Page
4 / 4
Mentions
Chillax room - JE to review 10. Floating dock - Jet ski dock - COMPLETE - Wooden fenders — COMPLETE - Jet ski fenders — ordered due on site 7/6 — Carlos to complete installation 7/6 EFTA00583051 - Table/Dock Box — table/seat top last coat of sealer applied 6/28 - draw baskets, doors & hinges all o
ade - COMPLETE 22. Wind Door — wind door on kitchen side needs openers and wind door stops — Brice purchasing in NM did not happen 23. Landscaping—Josephine to visit and organize garden 24. Solar lights - Brice to order 500 landscape lights — schedule for solar lights - should be placed every 30 feet -
ot pressurized — he pressurized and adjusted — COMPLETE 10. Floating Dock - Jet ski bumpers —ordered — presently on backorder — Overton will email Carlos when they are shipped out - Table/Dock Box - Dock box handles - COMPLETE - Dock box top to be resurfaced - Dock floors — staining needs completio
4 - Engineering shed outer wall — in progress - Landscaping —Sea grapes transplanted per JE direction 7/30 - COMPLETE - Landscaper(s) to travel to Josephine's nursery (Coral Bay) — trip cancelled - Engineering water boundary —Jules - COMPLETE 8. Triangle - - Peter transplanted 3 palms from engineering p
Chillax room - JE to review 10. Floating dock - Jet ski dock - COMPLETE - Wooden fenders — COMPLETE - Jet ski fenders — ordered due on site 7/6 — Carlos to complete installation 7/6 - Table/Dock Box — table/seat top last coat of sealer applied 6/28 - draw baskets, doors & hinges all on site - draw
ond and beach 22. Wind Door — wind door on kitchen side needs openers and wind door stops — Brice purchasing in NM did not happen 23. Landscaping—Josephine to visit and organize garden 24. Solar lights - Brice to order 500 landscape lights — schedule for solar lights - should be placed every 30 feet -
ot pressurized — he pressurized and adjusted — COMPLETE 10. Floating Dock - Jet ski bumpers -ordered - presently on backorder - Overton will email Carlos when they are shipped out - Table/Dock Box - Dock box handles - COMPLETE - Dock box top to be resurfaced - Dock floors — staining needs completio
Shelving — concrete wall repaired 7/27 - Landscaping — quote for Sea grapes forwarded to JE 7/12 - awaiting direction - Landscaper(s) to travel to Josephine's nursery (Coral Bay) — trip cancelled - Engineering water boundary — Jules - COMPLETE 8. Triangle - - Peter transplanted 3 palms from engineering
Entities connected to both Carlos and Josephine

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Lesley Groff
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONJermaine Ruan
PERSONNanna
PERSONLarry Visoski
PERSONLeon Black
PERSONKaren
PERSON
Karyna Shuliak
PERSON
Prince Andrew
PERSON
John F. Kennedy
PERSON
Julie K. Brown
PERSON
Ghislaine Maxwell
PERSON
Lawrence Krauss
PERSON
Prince Charles
PERSON
Oliver Stone
PERSON
Samantha Power
PERSON