4
Shared Docs
4
Same-Page
4 / 4
Mentions
PRELIMINARY INVOICE IlfSfreani t DVNAMIC• COMININV 500 Ciulfstream Rd. - Savannah, Georgia 31407 - Part/Model #: G550 AC Serial No./Tail No.: 5173 / N415L111 Mail Remittance To: Gulfstream Aerospace Corporation Overnight Remit
through Culfstream Aircraft Scheduling at 800-810-GULF (4853) or 912-965-4178. If not scheduled, aircraft downtime could increase significantly. This Service Change may only be installed at a Culfstream Aerospace facility. Resolution: Complied with ASC 085A XM Weather Installation Ref Item 17.2 CN1P 970851 Bil
r other instrument tendered as full satisfaction of a debt, must be forwarded to: Gulfstream Aerospace Aun. Credit Manager PO Box 2206 MIS B-05 Savannah, GA 31402 For detail description of the work complied with see the Work Order Detail report. Unless otherwise indicated. all financial values liste
through Gulfstream Aircraft Scheduling at 800-810-GULF (4853) or 912-965—$178. If not scheduled, aircraft downtime could increase significantly. This Service Change may only be installed at a Culfstream Aerospace facility. Resolution: Complied with ASC 085A XM Weather Installation Ref Item 17.2 CMP 970851 Bill
m Aerospace +1-561-261-5028 Acknowledged and Agreed to this day of Signature: Name: Title: Company: Gulfstream Proprietary P.O. Box 2206 • Savannah, GA 31402.2206 USA • Telephone (912) 965.3000 • gulfstream.com EFTA00612453 Gulfstrearn: A CI DYNAMICS COMPANY Inmarsat I-5 Jet ConneX (Ka) Cov
e Description (continued) B. AVIONICS / CABIN ELECTRONICS 2. Avionics (continued) 2.4 ASC 912 and ASC 123 Planeview MOS Upgrade $3,306 ASC 912: This Service Change (ASC 912) installs the PlaneView Master Operating System (MOS) software Media Part Number (PN) MM7031235-024. ASC 123: This Service Change (ASC 12
structions of ASC 143, except as provided for on the above listed Wiring Diagrams. All parts were purchased from Gulfstream Aerospace Corporation — Savannah, GA and were new at the time of installation. Successfully performed — ASC 143 Operational Test in accordance with Paragraph E. of the ASC's instru
ration is to reduce the potential for door seal deflation by ensuring a constant high pressure and maximum flow output from the door seal regulator. This Service Change installs additional pressure supply lines, one from each engine, routed from a port located in the pylon upstream of the 12th stage H.P. valve to t
Entities connected to both Savannah and This Service Change
Larry Visoski
PERSON
Prince Charles
PERSONLeon Black
PERSONGulfstream
ORGANIZATION
Julie K. Brown
PERSON
Dallas
LOCATION
George W. Bush
PERSON
Ghislaine Maxwell
PERSON
Samantha Power
PERSONDoug Band
PERSON
Courtney Love
PERSONSEMKIT
ORGANIZATIONVALVE
ORGANIZATIONCabin Operating Manual
ORGANIZATION
Honeywell
ORGANIZATION
Adriana Ross
PERSONCharles Thomas
PERSONHigh-Speed Data System
ORGANIZATIONCOTTER
ORGANIZATIONRadome
ORGANIZATION