he hydraulic. He will continue to call Bobby. Barge arrival home could be between June 10th-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/18/19. Fiberglass modifications in progress on starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be shipped off. re
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
ers on the hydraulic. e wi i con inue o call Barge arrival home could be between June 10th-15th Take Nana to Offshore to get tie Engines Checked Nautica delivered 5/18/19. Fiberglass modifications in progress on starboard side. will start cutting tubes off on Saturday 6/8 to be shipped off. request
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
rs on the hydraulic. e wr will con inue to call Barge anival home could be between June 10th-15th Take. to Offshore to get the Engines Checked Nautica delivered 918/19. Fiberglass modifications in progress on starboard side. will start cutting tubes off on Saturday 618 to be shipped off. requeste
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 100-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/16/19. Fiberglass modifications in progress on starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be shipped off. re
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Nautica and Tropical Shipping STT

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Carlos
PERSONDaphne Wallace
PERSONLeon Black
PERSON
Robert Gates
PERSONBanquette
ORGANIZATION
Samantha Power
PERSON
Sergey Brin
PERSON
Cabana
LOCATIONTiki Hut
ORGANIZATION
Maurice
PERSONCottage
LOCATIONSylvester
PERSON
Condoleezza Rice
PERSON
Oliver Stone
PERSON
Jesus Christ
PERSON
Palm Beach
LOCATION
Caterpillar
ORGANIZATION