4
Shared Docs
4
Same-Page
4 / 4
Mentions
ded to JE 7/12 - awaiting direction - Landscaper(s) to travel to Josephine's nursery (Coral Bay) — trip is cancelled - Engineering water boundary — Jules to finish 8. Triangle - - Landscaping direction required from JE 9. Flagpole Pool Cabana - - Furniture — investigate new desk, new furniture more l
imated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — will go to Subbase Drydock after 8/7 19. Timers - Review installing timers on air conditioners, irrig
Sale sent to Karen for review 40. New waste bins — (2) 20 yard bins purchased 7/26 — delivery to Tropical by 9/4 41. Old Road Down to Engineering — Jules to start removing very carefully — the one that the cement cow was removed on — there is a major power line running through that ramp — Jules to now
imated date to be shipped from factory (Illinois) 8/21 18. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — will go to Subbase Drydock — Boscoe revising estimates — "to keep" vs. "to sell" — for JE review - Lit
n 8/17, EDA on STT 8/21 - Kawasaki parts order — credit from (1) 2012 Kawasaki 750 EPS — Brice and Larry to review 3. Old Road Down to Engineering —Jules to start removing very carefully — the one that the cement cow was removed on — there is a major power line running through that ramp —Jules to now
imated date to be shipped from factory (Illinois) 8/21 19. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair —JE approved "to keep" repair budget of $43,843 — Brice determines when project begins - Little C - new
engineering area - Hydroseed all pull box areas & engineering - Continue to line all roads with stones 18. Roads - - Priority is Gym road grading —Jules to add loose top material 9/4 - Jules to work on road to pebble beach — start 9/4 - General regrading of roads -ongoing 19. Library - Lights on b
Mechanical Building Transformer — at Tropical FL 8/31 13. Boats - Lady G — sell — in hurricane storage 7/18 - Lady K — sell — survey forwarded to Darren & Rich, suggested price $225,000 - Big N — repair — at Subbase — work began 8/28 — due to splash 9/4, in house work to begin - Little C — engine at Offsho
Entities connected to both Jules and Darren & Rich

Jeffrey Epstein
PERSON
Marc Rich
PERSONDarren Indyke
PERSON
Richard Kahn
PERSON
Condoleezza Rice
PERSON
Carlos
PERSON
Lesley Groff
PERSON
Sergey Brin
PERSONJermaine Ruan
PERSON
Oliver Stone
PERSONChillax Bathroom
PERSONKaren
PERSONLeon Black
PERSON
Samantha Power
PERSONNanna
PERSONCecile de Jongh
PERSONJohn Deere
PERSONErika Kellerhals
PERSONRichard Barnett
PERSONLandscaping
PERSON