3
Shared Docs
3
Same-Page
4 / 3
Mentions
65. Weather permitting, still possibly Morday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support tho now Flanders and woo that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per s 6/ " I'm sorry, I don
6/5 Weather permitting, still possibly Monday 6/10 Work continues on the intake strainers and new cutouts in the hull were mace to support the new Flanders and pipe that was found to oe necessary. Corrosion ate the last ones. Paint Is being applied in the favorable weather. Per 5 " I'm sorry, I don't
be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not draining properly in Cabana 1 Install Kic
/5. Weather permitting, still possibly Monday 6110. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is bang applied in the favorable weather. Per 6/5 " sorry, I don't ha
be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is not draining properly in Cabana 1 Install
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 • I'm sorry,
be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor is not draining properly in Cabana 1 In
Entities connected to both Flanders and Repair Ceiling

Samantha Power
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSON
Jeffrey Epstein
PERSON
Oliver Stone
PERSONLeon Black
PERSONBench
ORGANIZATION
Prince Charles
PERSON
Palm Beach
LOCATION
Condoleezza Rice
PERSON
Joi Ito
PERSONNautica
ORGANIZATION
Caterpillar
ORGANIZATIONAllied
ORGANIZATIONChristmas Cove
LOCATIONBanquette
ORGANIZATIONYacht
ORGANIZATIONBarge
PERSONNC Unit
ORGANIZATIONWreckshop
ORGANIZATION