4
Shared Docs
4
Same-Page
5 / 4
Mentions
65. Weather permitting, still possibly Morday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support tho now Flanders and woo that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per s 6/ " I'm sorry, I don
6/5 Weather permitting, still possibly Monday 6/10 Work continues on the intake strainers and new cutouts in the hull were mace to support the new Flanders and pipe that was found to oe necessary. Corrosion ate the last ones. Paint Is being applied in the favorable weather. Per 5 " I'm sorry, I don't
5). A complete service was performed on the Denali and the rear brake pads changed jaMvill schedule the hose install once the part arrives. ill aw Insurance Coverage & Repairs to he made ailing estimate from Cliffs Auto Repair - by 5/31. Carlos wi I to e t e vehicle to Guardian 5/30 for adjusters inspection. Pools & Pow
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 " I'm sorry,
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5/31. Carlos will take the vehicle to Guardian 5/30 for adjuster's inspection.
/5. Weather permitting, still possibly Monday 6110. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is bang applied in the favorable weather. Per 6/5 " sorry, I don't ha
iness days (6/5). A complete se-vice was performed on the Denali and the rear brake pads changed. schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. awaiti etsotimate from 011is Auto Repair - by 5/31. will take the yeni ns e Guardian 5/30 for adjuster's inspection. Pods & Power Wa
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 • I'm sorry,
6/5). A complete service was performed on the Denali and the rear brake pads changed. Carlos will schedule the hose install once the part arrives. Insurance Coverage & Repairs to be made. Carlos awaiting estimate from Cliff's Auto Repair - by 5131. Carts will take the vehicle to Guardian 5/30 for adjuster's Inspection. P
Entities connected to both Flanders and Insurance Coverage & Repairs

Samantha Power
PERSON
Jeffrey Epstein
PERSON
Robert Gates
PERSON
Julie K. Brown
PERSON
Oliver Stone
PERSONLeon Black
PERSONTunnel, Engineering & Heli
ORGANIZATIONMuffler Rubber mount
LOCATIONIsland Wide
LOCATION
Palm Beach
LOCATIONBlue Ocean Tackle Inc.
ORGANIZATIONBarge
PERSONNew Planter
LOCATIONTrenching Area & Description
ORGANIZATIONClutch
ORGANIZATIONYeti Solar
PERSONJohn Deere
PERSONColums
PERSONPanels
ORGANIZATIONNC Unit
ORGANIZATION