4
Shared Docs
4
Same-Page
5 / 4
Mentions
65. Weather permitting, still possibly Morday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support tho now Flanders and woo that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per s 6/ " I'm sorry, I don
6/5 Weather permitting, still possibly Monday 6/10 Work continues on the intake strainers and new cutouts in the hull were mace to support the new Flanders and pipe that was found to oe necessary. Corrosion ate the last ones. Paint Is being applied in the favorable weather. Per 5 " I'm sorry, I don't
& Gemini eawater Systems R/O Parts On Island 102 99 R/O Water Smiley Water Testing 5/24 Anna °mailed last toot results (3/2017). 103 104 Lighting & Electrical 105 90 Cabanas 1-4 Dimmers Install Dimmers 106 91 Flagpole Pool Dimmers Dimmers not working properly 107 92 MC New Planter MC Planter &
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 " I'm sorry,
Parts On Island on GSJ On Island 102 89 R/0 Water Michael & Smiley Water Testing 5f24 Anna emalled last test results (3/2017). TZ 103 104 Lighting & Electrical rn 105 106 90 91 Cabanas 1-4 Flagpole Pool Danny & Keshawn Danny & Keshawn Dimmers Dimmers Install Dimmers Dimmers not working properly
/5. Weather permitting, still possibly Monday 6110. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is bang applied in the favorable weather. Per 6/5 " sorry, I don't ha
EDA to production completion 7/5. EDA to Tropical FL 7/12. EDA on STT 7/21 On Island on GSJ On Island 5/24 'nailed last test results (3/2017). Lighting & Electrical Install Dimmers Dimmers not working properly In progress Add Lighting to Water Fountain. Ordered 5/23; seri,. arrive at the PB house on Thursda
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 • I'm sorry,
l & Gemini Seawater Systems RIO Parts On Island H 89 R/O Water Michael & Smiley Water Testing 5/24 Anna emailed last test results (3/2017). Lighting & Electrical 90 Cabanas 1-4 Danny & Keshawn Dimmers Install Dimmers C 91 Flagpole Pool Danny & Keshawn Dimmers Dimmers not working properly 92 MC New
Entities connected to both Flanders and Lighting & Electrical

Jeffrey Epstein
PERSON
Samantha Power
PERSON
Julie K. Brown
PERSON
Robert Gates
PERSON
Oliver Stone
PERSONLeon Black
PERSONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Palm Beach
LOCATION
Joi Ito
PERSONInsurance Coverage & Repairs
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONTrenching Area & Description
ORGANIZATIONClutch
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATIONNautica
ORGANIZATIONTropical Shipping STT
ORGANIZATION
Caterpillar
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATIONFranks Electric
ORGANIZATION