4
Shared Docs
4
Same-Page
5 / 4
Mentions
65. Weather permitting, still possibly Morday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support tho now Flanders and woo that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per s 6/ " I'm sorry, I don
6/5 Weather permitting, still possibly Monday 6/10 Work continues on the intake strainers and new cutouts in the hull were mace to support the new Flanders and pipe that was found to oe necessary. Corrosion ate the last ones. Paint Is being applied in the favorable weather. Per 5 " I'm sorry, I don't
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ egan tile work today 5/31. Shower floor is not d
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 " I'm sorry,
anufacture electric progators. Arrived on STT 5/22. Cleared, off-loaded, awaiting transport to LSJ. MG will schedule barge to pick up directly from Tropical Shipping STT. awaiting Barge Create Berm to black LSJ view across from the Ft/O Containers Replace Bike handle Axle to be purchased asap Valve needed for Pol
/5. Weather permitting, still possibly Monday 6110. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is bang applied in the favorable weather. Per 6/5 " sorry, I don't ha
hting to be installed by 5/25. Order thatch to be installed after Hurricane Season. (70) rolls ordered, on STT 5/22. Cleared, awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Numbegan tile work today 5/31. Shower floor is n
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 • I'm sorry,
ghting to be installed by 5125. Order thatch to be installed after Hurricane Season. (70) roes ordered, on STT 5122. Cleared. awaiting pick up from Tropical Shipping STT. Supplier to be awarded Repair Ceiling. Lighting socket needed Build Dock structure same as LSJ Maurice began tile work today 5/31. Shower floor
Entities connected to both Flanders and Tropical Shipping STT

Jeffrey Epstein
PERSON
Samantha Power
PERSON
Julie K. Brown
PERSON
Robert Gates
PERSON
Oliver Stone
PERSONLeon Black
PERSONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Palm Beach
LOCATION
Joi Ito
PERSONInsurance Coverage & Repairs
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONTrenching Area & Description
ORGANIZATIONClutch
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATIONNautica
ORGANIZATIONLighting & Electrical
ORGANIZATION
Caterpillar
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATIONFranks Electric
ORGANIZATION