65. Weather permitting, still possibly Morday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support tho now Flanders and woo that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per s 6/ " I'm sorry, I don
6/5 Weather permitting, still possibly Monday 6/10 Work continues on the intake strainers and new cutouts in the hull were mace to support the new Flanders and pipe that was found to oe necessary. Corrosion ate the last ones. Paint Is being applied in the favorable weather. Per 5 " I'm sorry, I don't
off-loaded, awaiting pickup for transport to LSJ. 38 Dock GSJ Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock 39 Dock LSJ Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. 40 Christmas Cove
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 " I'm sorry,
on STT 5/28 - cleared. off-loaded, awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. Request moorings for Christmas Cove Sell
/5. Weather permitting, still possibly Monday 6110. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is bang applied in the favorable weather. Per 6/5 " sorry, I don't ha
off-loaded. awaiting pickup for transport to LSJ. Under CZM review for permitting: 1. Temporary Barge ramp (GSJ 38 Dock GSJ Permits North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock The permit for the LSJ WAVE ATTENUATOR and Dock is currently 39 Dock LSJ Perrrits under review by CZM. 40 Christmas Cove
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 • I'm sorry,
awaiting pickup for transport to LSJ. 38 Dock GSJ Amy Dempsey Permits Under CZM review for permitting: 1. Temporary Barge ramp (GSJ North), 2. Christmas Cove Service Dock, 3. GSJ Southern Dock •• 39 Dock LSJ Amy Dempsey Permits The permit for the LSJ WAVE ATTENUATOR and Dock is currently under review by CZM. i.
Entities connected to both Flanders and Christmas Cove Service Dock

Jeffrey Epstein
PERSON
Samantha Power
PERSON
Julie K. Brown
PERSON
Robert Gates
PERSON
Oliver Stone
PERSONLeon Black
PERSONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Palm Beach
LOCATION
Joi Ito
PERSONInsurance Coverage & Repairs
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONTrenching Area & Description
ORGANIZATIONClutch
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATIONNautica
ORGANIZATIONLighting & Electrical
ORGANIZATIONTropical Shipping STT
ORGANIZATION
Caterpillar
ORGANIZATIONFranks Electric
ORGANIZATION