4
Shared Docs
4
Same-Page
5 / 4
Mentions
65. Weather permitting, still possibly Morday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support tho now Flanders and woo that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per s 6/ " I'm sorry, I don
6/5 Weather permitting, still possibly Monday 6/10 Work continues on the intake strainers and new cutouts in the hull were mace to support the new Flanders and pipe that was found to oe necessary. Corrosion ate the last ones. Paint Is being applied in the favorable weather. Per 5 " I'm sorry, I don't
38 Dock LSJ Permits 39 Christmas Cove Moorings Moonngs 40 Old Generators Old Generators 41 Flagpole Pool Shade Structure 42 Five Palms Franks Electric 43 Five Palms Concrete 44 GSJ Ft./O Contractors 2nd R/O Intake 45 GSJ New Dock Dock Expansion 46 GS.) New Dock Water Sport Ramp 47 LSJ
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 " I'm sorry,
J Dock Exported an June 9.2019 933.34 PM BOT Michael & Contractors Amy Dempsey Amy Dempsey Patrick Michael & Bill Terry Michael & Contractors Franks Electric Peter Elie Michael & Contractors Michael & Jules Michael & Jules Michael & Paul "Global Tech' Amy Dempsey Michael Michael Michael Sylveste
/5. Weather permitting, still possibly Monday 6110. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is bang applied in the favorable weather. Per 6/5 " sorry, I don't ha
Structure Sell Generators: to coordinate sale of the old generators, o speak with Shade structure is replacing need fcr awning. 43 Five Palms Franks Electric I Electrical work to be done at Five Palms 44 Five Palms Concrete Need more direction from JE. He was not pleased with current layout. 45 GSJ
/5. Weather permitting, still possibly Monday 6/10. Work continues on the intake strainers and new cutouts in the hull were made to support the new Flanders and pipe that was found to be necessary. Corrosion ate the last ones. Paint is being applied in the favorable weather. Per Boscoe 6/5 • I'm sorry,
ck Exporters on Juno 6. 2019 6 07 52 ALl BOT Michael & Contractors Amy Dempsey Amy Dempsey Patrick Michael & Bill Terry Michael & Contractors Franks Electric Peter Elie Michael & Contractors Michael & Jules Michael & Jules Michael & Paul "Global Tech" Amy Dempsey Michael Michael Sylvester & James
Entities connected to both Flanders and Franks Electric

Jeffrey Epstein
PERSON
Samantha Power
PERSON
Julie K. Brown
PERSON
Robert Gates
PERSON
Oliver Stone
PERSONLeon Black
PERSONWreckshop
ORGANIZATIONGSJ Terrace
ORGANIZATION
Palm Beach
LOCATION
Joi Ito
PERSONInsurance Coverage & Repairs
ORGANIZATIONBlue Ocean Tackle Inc.
ORGANIZATIONTrenching Area & Description
ORGANIZATIONClutch
ORGANIZATIONOrder Pesticides & Fertilizer
ORGANIZATIONNautica
ORGANIZATIONLighting & Electrical
ORGANIZATIONTropical Shipping STT
ORGANIZATION
Caterpillar
ORGANIZATIONChristmas Cove Service Dock
ORGANIZATION