5
Shared Docs
5
Same-Page
5 / 5
Mentions
nd package was picked up 1/8/2013 To island on 1/8/2013. 1st package is still missing. Will continue to investigate. 14. Solar — - Solar Vendors — Toshiba reps on site 1/7. Toshiba have postponed on site visit. Awaiting final proposal. Toshiba responded to email of 1/8/2013 stating proposal would be re
- Lights, Switches, Electrical Equipment order — Danny to finalize - complete - Refit Existing Shed — sheeting etc ETA 1/5 roll up door to sail 1/9 Carlos cleared the 20' flat rack containing the building parts from buck steel 1/8/2013 10. Equipment/Household Purchase and Delivery - Pace Clocks x 2 un
n Chief Executive Officer Minister-President of the Government of Flanders, Belgium Minister for SMEs, Innovation and Digital Economy of France Toshiba Professor of Media, Arts and Sciences Columnist President of Israel Chief Sustainability Officer Minister of Housing and Urbanism and Minister
Ambassador Extraordinary and Permanent Mission of Switzerland Rodriguez Mancia Plenipotentiary Permanent Guatemala Representative of Guatemala Carlos Chairman Intercorp Peru Rodriguez-Pastor Cyriac Roeding Co-Founder and Chief Executive Officer shopkick Inc. USA James E. Rogers Chairman, P
ol - steps to be Installed- require JE direction - MC Pool - steps to be installed to pool pump room Heater 1/2/2013 14. Solar - - Solar Vendors-Toshiba reps on site 1/7. Toshiba have postponed on site visit. Awaiting final proposal Question Toshiba on new meter to measure line loss and solar batter
isting system to NY 16. Cell Repeater & Broadband - YAGI and repeater 2,200.00 1/8/2013 PEE approved Jermaine to order Hansen for Life Jackets Carlos to purchase 8 4of5 EFTA00598507 LSJ - island Punch List/Prolect list as of 1/3/1013 PRIORITIZE PROJECT DESCRIBTION Laborers Hours Labor Cos
work begins - After repair complete - Laundry, Hobbits, Bathroom, Pump Rm, Tech Rm all require repair/plaster/paint 14. Solar — - Solar Vendors — Toshiba reps on site 1/7. Toshiba have postponed on site visit. Awaiting final proposal 15. Media - - Larry investigating purchase Stewart Screen, Blue Ray
ard & Ceiling, Master Closet Area, - Beach Lighting — section out - Water Proof Covers — for all outside electrical areas — hanger, flag pole pool Carlos - - Hangers for Life Jackets — purchase 8 - Cleaning, Organizing & Inventory of Marine Shop, Dock Boxes Maintenance - - Barge — Paint Window Frames
hael Fetherstonhaugh, Business Advisor as a registered client of the Regional Development Board, Port Pirie, not installed on a computer until 2009, Toshiba laptop Computer, purchased 2009 Confirmed as Government and Police Targeting of an individual 27 years 1993 (first recorded Intellectual Property
Trafficking 2015 Extreme Sexual Targeting Carlos - Connected to Sexual Targeting of an individual conducted by personal relationship connection to Carlos, David, Manager of Central Motel, Port Pirie Targeted victim was introduced to Carlos by the Manager of Central Motel, David Refer to File Stage 2A
Entities connected to both Toshiba and Carlos

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Alfredo Rodriguez
PERSONDaphne Wallace
PERSON
Marc Rich
PERSON
Lesley Groff
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSONJermaine Ruan
PERSONLeon Black
PERSON
Prince Andrew
PERSON
John F. Kennedy
PERSONBarge
PERSON
Julie K. Brown
PERSON
Michael Douglas
PERSON
Ghislaine Maxwell
PERSONCecile de Jongh
PERSON
Oliver Stone
PERSON
Robert Gates
PERSON
Alan Dershowitz
PERSON