6
Shared Docs
6
Same-Page
6 / 6
Mentions
June 10th-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/18/19. Fiberglass modifications in progress on starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be shipped off. requested estimate for bow thruster replacement @ $3400 before shipping(just need o
he hydraulic. He will continue to call Bobby. Barge arrival home could be between June 10th-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/18/19. Fiberglass modifications in progress on starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be shipped off. re
6/5 Clean office immediately 6/5 Marine, Barge & Water Spode Nautica delivered to Offshore Marine Subbase 05/1819. Offshore Marine has scheduled Jesus the tube guy for 5f31 to remove tube and ship out. Fiberglass repairs will start right after. Exported on June 0 2019 6.07.52 AM BOT Page 13 of 18
ers on the hydraulic. e wi i con inue o call Barge arrival home could be between June 10th-15th Take Nana to Offshore to get tie Engines Checked Nautica delivered 5/18/19. Fiberglass modifications in progress on starboard side. will start cutting tubes off on Saturday 6/8 to be shipped off. request
June 100-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/16/19. Fiberglass modifications in progress on starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be shipped off. requested estimate for bow thruster replacement (cg $3400 before shipping(just need
the hydraulic. He will continue to call Bobby. Barge arrival home could be between June 100-15th Take Nana to Offshore to get the Engines Checked Nautica delivered 5/16/19. Fiberglass modifications in progress on starboard side. Jesus will start cutting tubes off on Saturday 6/8 to be shipped off. re
Groff : Daphne Wallace From: Carlos Rodriguez Sent: Wed 5/29/2019 7:36:49 PM Subject: Nautica 42 Greetings all, offshore marine has scheduled Jesus the tube guy for this Friday to remove tube and ship out. fiberglass repairs will start right after. Thank you Carlos EFTA_R1_01116655 EFTA02288
To: Lesley Groff : Daphne Wallace From: Carlos Rodriguez Sent: Wed 5/29/2019 7:36:49 PM Subject: Nautica 42 Greetings all, offshore marine has scheduled Jesus the tube guy for this Friday to remove tube and ship out. fiberglass repairs will start right
:41:34 PM Subject: Re: Nautica 42 ok thanks On May 29, 2019, at 3:36 PM, Carlos Rodriguez •c w rote: Greetings all, offshore marine has scheduled Jesus the tube guy for this Friday to remove tube and ship out. fiberglass repairs will start right after. Thank you Carlos EFTA_R1_01116707 EFTA02288
To: Carlos (who works for JE ; Rich Kahn Cc: Daphne Wallac From: Sent: Wed 5/29/2019 7:41:34 PM Subject: Re: Nautica 42 ok thanks On May 29, 2019, at 3:36 PM, Carlos Rodriguez •c w rote: Greetings all, offshore marine has scheduled Jesus the tube guy for this Fri
lso asked Carlos about the Nautica Boat Tube and he said the tube guy will be off island for a few Months. Notes: I found out from Offshore that Mr. Jesus is on St. Thomas and now would be a good time to reach out to him Mr. Eldred cell: (284) 499-2862, Carlos cell: Patrick cell: , Randy cell: EFTA0
anything about the Nautica Boat from anyone and he said "Carlos, Patrick, Stephanie and Michael had a meeting and all of them agreed not to fix the Nautica Boat". So, I called Mr. Eldred myself to get real answers. Mr. Eldred told me that Carlos or Patrick never mentioned anything about fixing the Naut
Entities connected to both Jesus Christ and Nautica

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Richard Kahn
PERSONLarry Visoski
PERSON
Donald Trump
PERSONLeon Black
PERSON
Prince Charles
PERSON
Julie K. Brown
PERSON
Alfredo Rodriguez
PERSON
Samantha Power
PERSON
Eric Trump
PERSONEmmy Taylor
PERSON
Oliver Stone
PERSON
Carlos
PERSON
Ghislaine Maxwell
PERSON
Paul Ryan
PERSON
Robert Gates
PERSONDarren Indyke
PERSON
Condoleezza Rice
PERSONDaphne Wallace
PERSON