3
Shared Docs
3
Same-Page
8 / 3
Mentions
essed on a time and materials basis. New Customer Selected Veneer will be applied to the existing substrates. The new veneer will be finished with Gulfstreant standard III-BIL clear coat finish and polished to a predetermined luster. All applicable internal surfaces will be cleaned and retained in existin
45. Step: 20.1.7 Completed FAA form 8100-2 issued for new registration number by Gulfstream ODA. Step: 20.1.8 Completed If the customer defers Gulfstream ()DA issuance of a replacement airworthiness certificate. a Corridor squawk will be signed as deferred by the customer. Rref : 14 CFR 91.203 (a) (1)
iguration report of the Central Maintenance Computer (CMC). The CMC report can be stored on the aircraft PC laptop then electronically submitted to Culfstream at asc.softwareCrgulfstream.com. Allow three (3) to five (5) days for the CMC report review and up to twenty-one (21) days for the creation of a n
not included in this proposal. Any finish other than natural will be evaluated and addressed on a time and materials basis. This proposal includes Natural Wood Veneer. Composite Veneer (due to ordering limitations) may require Gulfstream to purchase additional sheets of that product. Should additional sheets will
: Title: Company: Gulfstream Proprietary P.O. Box 2206 • Savannah, GA 31402.2206 USA • Telephone (912) 965.3000 • gulfstream.com EFTA00612453 Gulfstrearn: A CI DYNAMICS COMPANY Inmarsat I-5 Jet ConneX (Ka) Coverage Map a ur co' 00' 60' - y I-S Adam% ri 1.5 indon 1-5 Poolc /et COA6tX rel•O
in this Proposal if the foregoing conditions are not satisfied. Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each Gulfstream US facility. Proposals for work at any non-US Gulfstream facilities are specific and binding only as to the f
Gulfstream. PlaneParts@: Except as specifically identified in a PART I Workscope, this Proposal does not take into account any parts provided under Gulf stream's PlaneParts@ program. To enroll or learn more about the PlaneParts() program please visit htto://www.gulfstream.com/oroduct-su000rt/su000rt-services/
not included in this proposal. Any finish other than natural will be evaluated and addressed on a time and materials basis. This proposal includes Natural Wood Veneer. Composite Veneer (due to ordering limitations) may require Gulfstream to purchase additional sheets of that product. Should additional sheets will
45. Step: 20.1.7 Completed FAA form 8100-2 issued for new registration number by Gulfstream ODA. Step: 20.1.8 Completed If the customer defers Gulfstream ()DA issuance of a replacement airworthiness certificate. a Corridor squawk will be signed as deferred by the customer. Rref : 14 CFR 91.203 (a) (1)
tion of exterior paint, a weight and balance will be performed on the aircraft. Any items not listed above will be quoted on a per item basis by the Culfstream facility's Paint Operations Manager. including labor and materials on a Work Change Request (WCR). Billing NIethod flours Rate Total Labor USD:
not included in this proposal. Any finish other than natural will be evaluated and addressed on a time and materials basis. This proposal includes Natural Wood Veneer. Composite Veneer (due to ordering limitations) may require Gulfstream to purchase additional sheets of that product. Should additional sheets will
Entities connected to both Gulfstream and Natural Wood Veneer
Larry Visoski
PERSONLeon Black
PERSON
Savannah
LOCATION
Samantha Power
PERSONDoug Band
PERSON
Julie K. Brown
PERSON
Prince Charles
PERSONCabin Operating Manual
ORGANIZATIONNew Components
ORGANIZATIONRadome
ORGANIZATIONLindsay
PERSONVALVE
ORGANIZATIONCert Fox
PERSONProduct Support Program Management
ORGANIZATIONThis Service Change
ORGANIZATIONthe Satellite Television
ORGANIZATION
Adriana Ross
PERSONModem
ORGANIZATIONBroad-Band
ORGANIZATIONMODMAN
ORGANIZATION