4
Shared Docs
4
Same-Page
10 / 4
Mentions
essed on a time and materials basis. New Customer Selected Veneer will be applied to the existing substrates. The new veneer will be finished with Gulfstreant standard III-BIL clear coat finish and polished to a predetermined luster. All applicable internal surfaces will be cleaned and retained in existin
45. Step: 20.1.7 Completed FAA form 8100-2 issued for new registration number by Gulfstream ODA. Step: 20.1.8 Completed If the customer defers Gulfstream ()DA issuance of a replacement airworthiness certificate. a Corridor squawk will be signed as deferred by the customer. Rref : 14 CFR 91.203 (a) (1)
iguration report of the Central Maintenance Computer (CMC). The CMC report can be stored on the aircraft PC laptop then electronically submitted to Culfstream at asc.softwareCrgulfstream.com. Allow three (3) to five (5) days for the CMC report review and up to twenty-one (21) days for the creation of a n
craft utilizing drawing 1159SB57083 to meet the prerequisite minimum requirements of ASC 107 and AM' 910 are part of a managed program conducted by Product Support Program Management (PSPM). Resolution: COMPLIED WITH ASC 912 and ASC 123 Planeview MOS Upgrade Billing Method Flours Rate Total Labor USD: Flat Rate 53,306.00
: Title: Company: Gulfstream Proprietary P.O. Box 2206 • Savannah, GA 31402.2206 USA • Telephone (912) 965.3000 • gulfstream.com EFTA00612453 Gulfstrearn: A CI DYNAMICS COMPANY Inmarsat I-5 Jet ConneX (Ka) Coverage Map a ur co' 00' 60' - y I-S Adam% ri 1.5 indon 1-5 Poolc /et COA6tX rel•O
in this Proposal if the foregoing conditions are not satisfied. Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each Gulfstream US facility. Proposals for work at any non-US Gulfstream facilities are specific and binding only as to the f
Gulfstream. PlaneParts@: Except as specifically identified in a PART I Workscope, this Proposal does not take into account any parts provided under Gulf stream's PlaneParts@ program. To enroll or learn more about the PlaneParts() program please visit htto://www.gulfstream.com/oroduct-su000rt/su000rt-services/
rcraft utilizing drawing 1159S857083 to meet the prerequisite minimum requirements of ASC 107 and ASC 910 are part of a managed program conducted by Product Support Program Management (PSPM). Incorporation MUST be coordinated through PSPM via email at [email protected] or through Gulfstream Aircraft Scheduling at 800-810-GULF (
45. Step: 20.1.7 Completed FAA form 8100-2 issued for new registration number by Gulfstream ODA. Step: 20.1.8 Completed If the customer defers Gulfstream ()DA issuance of a replacement airworthiness certificate. a Corridor squawk will be signed as deferred by the customer. Rref : 14 CFR 91.203 (a) (1)
tion of exterior paint, a weight and balance will be performed on the aircraft. Any items not listed above will be quoted on a per item basis by the Culfstream facility's Paint Operations Manager. including labor and materials on a Work Change Request (WCR). Billing NIethod flours Rate Total Labor USD:
craft utilizing drawing 1159SB57083 to meet the prerequisite minimum requirements of ASC 107 and AM' 910 are part of a managed program conducted by Product Support Program Management (PSPM). Resolution: COMPLIED WITH ASC 912 and ASC 123 Planeview MOS Upgrade Billing Method Flours Rate Total Labor USD: Flat Rate 53,306.00
3-GIV.108S-R00 14 March 2013 Gulfstream GIV Serial Number 1085 JEGE. LLC Certification: It is Gulfstrcam's intention to certify the GAViS as per Gulfstream STC ST04257AT-D. Any deviations from STC will be done as time and materials. Notes: • A flight test will be required. Costs associated with the fligh
ysis or load test/report may be required to complete the workscope. which Gulfstream will perform at Customer's discretion as an additional charge. Gulfstreant reserves the right to perform an electrical load test if it is determined that the provided load analysis is not adequate. Page 5 of 9 This propos
CAS 7.1 Installation Notes: • This ASC may only be installed at Gulfstream Aerospace or Gulfstream approved facilities. • This ASC is managed by Product Support Program Management PSPM . Inco ration must be coordinated through Gulfstream Aircraft Scheduling at or If not scheduled, aircraft downtime could increase significa
Entities connected to both Gulfstream and Product Support Program Management
Larry Visoski
PERSONLeon Black
PERSON
Savannah
LOCATION
Samantha Power
PERSON
Dallas
LOCATIONDoug Band
PERSON
Honeywell
ORGANIZATION
Julie K. Brown
PERSON
Prince Charles
PERSONCabin Operating Manual
ORGANIZATION
Rockwell Collins
ORGANIZATIONWorkscope
PERSONNew Components
ORGANIZATIONGulfstream Aerospace
ORGANIZATIONRadome
ORGANIZATIONLindsay
PERSONThis Service Change
ORGANIZATIONRusty Cramer
PERSONCustomer's Aircraft
ORGANIZATIONCert Fox
PERSON