8
Shared Docs
8
Same-Page
16 / 8
Mentions
essed on a time and materials basis. New Customer Selected Veneer will be applied to the existing substrates. The new veneer will be finished with Gulfstreant standard III-BIL clear coat finish and polished to a predetermined luster. All applicable internal surfaces will be cleaned and retained in existin
45. Step: 20.1.7 Completed FAA form 8100-2 issued for new registration number by Gulfstream ODA. Step: 20.1.8 Completed If the customer defers Gulfstream ()DA issuance of a replacement airworthiness certificate. a Corridor squawk will be signed as deferred by the customer. Rref : 14 CFR 91.203 (a) (1)
iguration report of the Central Maintenance Computer (CMC). The CMC report can be stored on the aircraft PC laptop then electronically submitted to Culfstream at asc.softwareCrgulfstream.com. Allow three (3) to five (5) days for the CMC report review and up to twenty-one (21) days for the creation of a n
ngineering review is completed. estimated charges approximately 518,000. Changes to the Aircraft's Completion Center Maintenance Handbook (COUR), or Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be requested by the Customer, it may be provided at additional charg
: Title: Company: Gulfstream Proprietary P.O. Box 2206 • Savannah, GA 31402.2206 USA • Telephone (912) 965.3000 • gulfstream.com EFTA00612453 Gulfstrearn: A CI DYNAMICS COMPANY Inmarsat I-5 Jet ConneX (Ka) Coverage Map a ur co' 00' 60' - y I-S Adam% ri 1.5 indon 1-5 Poolc /et COA6tX rel•O
in this Proposal if the foregoing conditions are not satisfied. Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each Gulfstream US facility. Proposals for work at any non-US Gulfstream facilities are specific and binding only as to the f
Gulfstream. PlaneParts@: Except as specifically identified in a PART I Workscope, this Proposal does not take into account any parts provided under Gulf stream's PlaneParts@ program. To enroll or learn more about the PlaneParts() program please visit htto://www.gulfstream.com/oroduct-su000rt/su000rt-services/
neering review is completed, estimated charges approximately $18,000. • Changes to the Aircraft's Completion Center Maintenance Handbook (CCMH), or Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be requested by the Customer, it may be provided at additional charg
in this Proposal if the foregoing conditions are not satisfied. Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each Gulfstream US facility. Proposals for work at any non-US Gulfstream facilities are specific and binding only as to the f
sufficiency of which are hereby acknowledged by Seller, and being the owner of the full legal and beneficial title in and to that certain used 1988 Gulfstream G-IV aircraft, bearing manufacturer's serial number 1085, and currently registered with the United States Federal Aviation Agency as N 1 20JE, together w
vered during the course of the installation. • Manuals — Modifications: Changes to the Aircraft's Completion Center Maintenance Handbook (CCMH) or Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be requested by the Customer, it may be provided at additional charge
45. Step: 20.1.7 Completed FAA form 8100-2 issued for new registration number by Gulfstream ODA. Step: 20.1.8 Completed If the customer defers Gulfstream ()DA issuance of a replacement airworthiness certificate. a Corridor squawk will be signed as deferred by the customer. Rref : 14 CFR 91.203 (a) (1)
tion of exterior paint, a weight and balance will be performed on the aircraft. Any items not listed above will be quoted on a per item basis by the Culfstream facility's Paint Operations Manager. including labor and materials on a Work Change Request (WCR). Billing NIethod flours Rate Total Labor USD:
ineering review is completed. estimated charges approximately $18,000. Changes to the Aircraft's Completion Center Maintenance handbook (CCNIII), or Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be requested by the Customer, it may be provided al additional charg
in this Proposal if the foregoing conditions are not satisfied. Unless otherwise indicated on the face of this Proposal, any proposal for Work in a Gulfstream US facility is valid for each Gulfstream US facility. Proposals for work at any non-US Gulfstream facilities are specific and binding only as to the f
Gulfstream. PlaneParts@: Except as specifically identified in a PART I Workscope, this Proposal does not take into account any parts provided under Gulf stream's PlaneParts@ program. To enroll or learn more about the PlaneParts@ program please visit http://www.gulfstream.com/product-support/support-services/p
vered during the course of the installation. • Manuals — Modifications: Changes to the Aircraft's Completion Center Maintenance Handbook (CCMH) or Cabin Operating Manual (COM) are not included as part of this Proposal. Should a modified CCMH or COM be requested by the Customer, it may be provided at additional charge
3-GIV.108S-R00 14 March 2013 Gulfstream GIV Serial Number 1085 JEGE. LLC Certification: It is Gulfstrcam's intention to certify the GAViS as per Gulfstream STC ST04257AT-D. Any deviations from STC will be done as time and materials. Notes: • A flight test will be required. Costs associated with the fligh
ysis or load test/report may be required to complete the workscope. which Gulfstream will perform at Customer's discretion as an additional charge. Gulfstreant reserves the right to perform an electrical load test if it is determined that the provided load analysis is not adequate. Page 5 of 9 This propos
03 I 3-223-GIV.108S-R00 14 March 2013 Gulfstream GIV Serial Number 1085 JEGE. LLC Changes to the Completion Center Maintenance Handbook (CCMH) or Cabin Operating Manual (COM) are not included as pan of this proposal. Should a modified CCMH or COM be requested. it will be quoted separately or performed on a time and
o the rates set forth in the Gulfstream Labor Rate Letter in effect as of the date the work is performed.. and (b) materials are billed according to Gulfstreant's standard prices in effect on the date the material is used. Any incremental charge under Gulfstream's Component Exchanged Program will be billed b
ange pricing will be billed as accrued, be it either less than or more than quoted. Changes to the Completion Center Maintenance Handbook (CCMH) or Cabin Operating Manual (COM) are not included as part of this proposal. Should a modified CCMH or COM be requested. it will be quoted separately or performed on a time and
o the rates set forth in the Gulfstream Labor Rate Letter in effect as of the date the work is performed.. and (b) materials are billed according to Gulfstreant's standard prices in effect on the date the material is used. Any incremental charge under Gulfstream's Component Exchanged Program will be billed b
ange pricing will be billed as accrued, be it either less than or more than quoted. Changes to the Completion Center Maintenance Handbook (CCMH) or Cabin Operating Manual (COM) are not included as part of this proposal. Should a modified CCMH or COM be requested. it will be quoted separately or performed on a time and
Entities connected to both Gulfstream and Cabin Operating Manual
Larry Visoski
PERSONLeon Black
PERSON
Savannah
LOCATION
Samantha Power
PERSON
Dallas
LOCATIONDoug Band
PERSON
Honeywell
ORGANIZATIONGulfstream Aerospace Corporation
ORGANIZATION
Prince Charles
PERSON
Julie K. Brown
PERSONWorkscope
PERSONHyperion Air, Inc.
ORGANIZATION
JPMorgan Chase
ORGANIZATIONCustomer's Aircraft
ORGANIZATIONRusty Cramer
PERSON
Rockwell Collins
ORGANIZATIONGulfstream Aerospace
ORGANIZATION
Florida
LOCATIONProduct Support Program Management
ORGANIZATIONNew Components
ORGANIZATION