5
Shared Docs
5
Same-Page
5 / 5
Mentions
3:51 PM EST To: Richard Kahn < Cc: ann rodriquez ita Good evening Rich Gsj is online as 5:15 today on the temporary link that Choice installed. Hector will be monitoring the link for stability. There is a block on the phone side but he will open the path for the phone tomorrow afternoon. Regards
y findings are as follows: I spoke to Ms. Hardly at Micronet (the company that licensed your first dragonwaves) . They confirmed the timeframe that FutureTech stated that this process does take from 30— 90 days. The reason was explained to me as follows: 1. FCC 601 application is filled out and submitted
ully functional. Choice made the minor repairs and reinstalled the radio and the Choice internet link is restored. Allister, who works closely with Hector recommends 1 or 2 spare dragonwaves to be on standby. FYI: In addition, I continued to investigate the repair policy with Chris from FutureTech (ou
ly with Hector recommends 1 or 2 spare dragonwaves to be on standby. FYI: In addition, I continued to investigate the repair policy with Chris from FutureTech (our Dragonwave vender). He stated that the warranty on the Dragonwave radios do not cover lightening strikes. But the protocol for repairs is: •
ully =unctional. Choice made the minor repairs and reinstalled the radio =nd the Choice =nternet link is restored. Allister, who =orks closely with Hector recommends 1 or 2 spare =ragonwaves to be on standby. FYI: In addition, I continued to investigate the repair policy with Chris from FutureTech (ou
ly with Hector recommends 1 or 2 spare =ragonwaves to be on standby. FYI: In addition, I continued to investigate the repair policy with Chris from FutureTech (our Dragonwave =ender). =e stated that =he warranty on the Dragonwave radios do not cover lightening =trikes. But the =rotocol for repairs is: *
nn rodriquez Subject: Re: Choice internet do it carefully On Tue, Mar 1, 2016 at 7:40 PM, Jermaine Ruan wrote: Good Evening Boss, Allan, Omar, Hector and I finalized our meeting for the nee=ed materials required to equip GSJ with internet in a few days. I am requesting you= permission to have a b
y findings are as follows: I spoke to Ms. Hardly=at Micronet (the company that licensed your first dragonwaves) .=They confirmed the timeframe that FutureTech stated that this process does=take from 30 - 90 days. The reason w=s explained to me as follows: * 1. 4P FCC 601 application is filled out and su
l.com <mailto:[email protected]=m» wrote: do it carefully On Tue, =ar 1, 2016 at 7:40 PM, Jermaine Ruan wrote: Good Evening Boss, Allan, Omar, Hector and I finalized our meeting for the needed=materials required to equip GSJ with internet in a few days. <=div> =div>l am requesting your p=rmission
= findings are as follows: I spoke to Ms. Hardly at=Micronet (the company that licensed your first dragonwaves) . Th=y confirmed the timeframe that FutureTech stated that this process does ta=e from 30 - 90 days. The reason was =xplained to me as follows: 4, 1. 40FCC 601 application is filled out and s
Entities connected to both Hector and FutureTech

Jeffrey Epstein
PERSONJermaine Ruan
PERSON
Richard Kahn
PERSON
Marc Rich
PERSONDoug Band
PERSONDragonwave
ORGANIZATION
Alan Dershowitz
PERSON
St James
LOCATIONRodriquez Ann
PERSONMicronet
ORGANIZATIONBovoni
PERSONONTARIO CANADA
ORGANIZATIONAllister
PERSONJongh Cecile
PERSON
OTTAWA
LOCATION