5
Shared Docs
5
Same-Page
5 / 5
Mentions
be forward to vendors for bid. Review of coral stone layout will also occur Lastly went to LSJ on our last trip for approx 14 days to allow both Curtis and Silvina to focus on construction and design aspects. I did mention to them both at that time if there was anything that we should pass onto Dou
/approval are the fundamental requirements of any manager, this was explained to them when they applied for the position. Reflecting back upon the Bill Rowles situation and not wishing to make the same mistake twice. I would advise that new management is sort for LSJ immediately, even if we have to provid
[email protected]] From: Sent: Tue 5/5/2009 1:26:39 PM Subject: RE: and I arrived I.51 late last night, I am working on Paneling install with Curtis, is #1 . Left message with JP office last week, and again this morning. Will keep you posted. Along with review of Bill Rowles position and revised
on Paneling install with Curtis, is #1 . Left message with JP office last week, and again this morning. Will keep you posted. Along with review of Bill Rowles position and revised generator proposal for PBI, kitchen design, etc s taking over Admin from Silvina, so she can catch up on design aspects and als
nick s< As per message below, we are still on schedule and the Office Pavilion will be ready for Fancelli installers to start on Monday May 18th. Curtis On 5/11/09 8:08 AM, "curtis" <[email protected]> wrote: See attached Bill Rowles weekly report for construction. We will be starting cabinet inst
n will be ready for Fancelli installers to start on Monday May 18th. Curtis On 5/11/09 8:08 AM, "curtis" <[email protected]> wrote: See attached Bill Rowles weekly report for construction. We will be starting cabinet installation on the 18th of May William Rowles Lafayette Contractors, LLC 6100 Red Ho
Brice, As per message below, we are still on schedule and the Office Pavilion will be ready for Fancelli installers to start on Monday May 18th. Curtis On 5/11/09 8:08 AM, "curtis" < wrote: See attached Bill Rowles weekly report for construction. We will be starting cabinet installation on the 18
the Office Pavilion will be ready for Fancelli installers to start on Monday May 18th. Curtis On 5/11/09 8:08 AM, "curtis" < wrote: See attached Bill Rowles weekly report for construction. We will be starting cabinet installation on the 18th of May William Rowles Lafayette Contractors, LLC 6100 Red Ho
to vendors for bid. Review of coral stone layout will also occur Lastly Karen And I went to LSJ on our last trip for approx 14 days to allow both Curtis and Silvina to focus on construction and design aspects. I did mention to them both at that time if there was anything that we should pass onto Doug
/approval are the fundamental requirements of any manager, this was explained to them when they applied for the position. Reflecting back upon the Bill Rowles situation and not wishing to make the same mistake twice. I would advise that new management is sort for LSJ immediately, even if we have to provid
Entities connected to both Curtis and Bill Rowles

Jeffrey Epstein
PERSONBrice Gordon
PERSON
Condoleezza Rice
PERSON
Marc Rich
PERSONDarren Indyke
PERSONEmad Hanna
PERSON
Lesley Groff
PERSONDaphne Wallace
PERSONGary Kerney
PERSON
Richard Kahn
PERSONWilliam Rowles
PERSONMonique Harry
PERSONLafayette Contractors
ORGANIZATIONKaren
PERSONDoug Schoettle
PERSONFancelli
PERSON
St Thomas
LOCATION
Carlos
PERSONScott Graff
PERSON
Atlanta
LOCATION