o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ncies to expedite the permit process • Attendance at Pre-Application Meeting, Interagency Meeting, Meetings with NMFS, FWS, COE, CZM as necessary, Public Hearings and Senate Hearings This does not include drafting of a Biological Assessment (BA) if Formal Section 7 Consultation is required by NMFS or FWS, if
Entities connected to both San Juan and Public Hearings

Jeffrey Epstein
PERSON
Bill Clinton
PERSONGreat Bay
LOCATION
Paul Ryan
PERSON
Sarah Ferguson
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONFerguson Kroblin
PERSONVIWAPA
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONUtilities
ORGANIZATIONthe Coastal Zone
LOCATIONAir Quality
ORGANIZATIONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONAcroporapalmata
ORGANIZATION