o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.01f Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
however that this should be kept to a minimum. The offshore work will require sediment control devices for the construction work 5.011 Schedule for Construction Activities & Implementation of Sediment Control Measures: We will need to present the detailed schedule of each construction activity and subsequent activity. This does not have to be actual date
Entities connected to both San Juan and Construction Activities & Implementation of Sediment Control

Jeffrey Epstein
PERSON
Bill Clinton
PERSONGreat Bay
LOCATION
Paul Ryan
PERSON
Sarah Ferguson
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONFerguson Kroblin
PERSONVIWAPA
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONUtilities
ORGANIZATIONthe Coastal Zone
LOCATIONAir Quality
ORGANIZATIONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONthe DPNR State Historic Preservation Officer
ORGANIZATIONAcroporapalmata
ORGANIZATION