4
Shared Docs
4
Same-Page
4 / 4
Mentions
o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
tion 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
encies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quality Certificate from the Division of Environmental Protection. The COE, NMFS an
Entities connected to both San Juan and Federal Fish and Wildlife Service

Jeffrey Epstein
PERSON
Bill Clinton
PERSONGreat Bay
LOCATION
Paul Ryan
PERSON
Sarah Ferguson
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONFerguson Kroblin
PERSONVIWAPA
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONUtilities
ORGANIZATIONthe Coastal Zone
LOCATIONAir Quality
ORGANIZATIONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONDescription of Project
ORGANIZATIONAcroporapalmata
ORGANIZATION