o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
Entities connected to both San Juan and Major Coastal Zone Management

Jeffrey Epstein
PERSON
Bill Clinton
PERSONGreat Bay
LOCATION
Paul Ryan
PERSON
Sarah Ferguson
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONFerguson Kroblin
PERSONVIWAPA
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONUtilities
ORGANIZATIONthe Coastal Zone
LOCATIONAir Quality
ORGANIZATIONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONDescription of Project
ORGANIZATIONAcroporapalmata
ORGANIZATION