o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
uired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
importance to avoid reefs to reduce the potential of having to engage in formal BIOIMPACT, INC. Page 2 EFTA00583317 Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. The project will require a Major Coastal Zone Management (CZM) Wate
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
ired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
quired by NMFS. It will be of the utmost importance to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federa
Entities connected to both San Juan and the Federal Agencies

Jeffrey Epstein
PERSON
Bill Clinton
PERSONGreat Bay
LOCATION
Paul Ryan
PERSON
Sarah Ferguson
PERSON
St. Croix
LOCATIONErika Kellerhals
PERSONAmy Claire Dempsey
PERSONVIWAPA
ORGANIZATIONFerguson Kroblin
PERSONUtilities
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONthe Coastal Zone
LOCATIONAir Quality
ORGANIZATIONBioimpact, Inc.
ORGANIZATION
Coastal
LOCATIONHistoric Land
LOCATIONTerrestrial Resources
ORGANIZATIONDescription of Project
ORGANIZATIONMajor Coastal Zone Management
ORGANIZATION