5
Shared Docs
5
Same-Page
5 / 5
Mentions
3860 irr® Integra Realty Resources Caribbean December 15, 2015 Roberto A. Soltero Vice President Banco Popular de Puerto Rico PO Box 362708 San Juan, PR 00936-2708 6500 Red Hook Plaza Suite 201 St. Thomas, VI 00802 US. Virgin Islands T 340.714-7325 www.irr.com SUBJECT: Market Value Appraisa
foreclosure. This created difficulty for marinas to obtain financing. IGY American Yacht Harbor Marina EFTA00803890 Marina Market Analysis 26 Coastal marinas along the eastern seaboard were fairly successful until the recent recession, with many documenting 100% occupancy or waiting lists. This ma
o select the preferred route. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
ny merit to a dock extension. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
uld be the easiest to permit. Once we have determined location and preliminary designs we should attend an Interagency Meeting with the U.S. COE in San Juan and a Pre-application meeting with CZM so that we can determine their issues and concerns. Then we need to complete the environmental studies and pr
the questions which are raised to the COE's satisfaction and to that of the reviewing agencies an Intent to Issue Letter is issued. Once we have a Coastal Consistency Letter (written when the CZM permit is granted) and a Water Quality Certificate (which will be requested by CZM during the process), the
Entities connected to both San Juan and Coastal

Jeffrey Epstein
PERSON
Puerto Rico
LOCATION
Charlotte Amalie
LOCATION
St Thomas
LOCATION
George W. Bush
PERSONDarren Indyke
PERSON
Bill Clinton
PERSON
United States
LOCATION
Ghislaine Maxwell
PERSON
Marc Rich
PERSONDaphne Wallace
PERSONLeon Black
PERSON
Richard Kahn
PERSON
U.S. Virgin Islands
LOCATION
New York
LOCATIONMaria Farmer
PERSONGreat Bay
LOCATION
Samantha Power
PERSON
Tortola
LOCATION
West Palm Beach
LOCATION