5
Shared Docs
5
Same-Page
5 / 5
Mentions
ies composition of the island is typical of an east-facing, semi-arid Caribbean island and closely resembles the vegetation found on the east end of St. John and St. Thomas. There are approximately 100 native species present on the island. One species is listed on the Federal or Territorial Endangered Sp
Total Proposed Structures Existing Structures C-2 Workshop C-3 Stone Shelter C-4 Workshop, Locker Room & RO Facility C-5 Staff House C-6 Main House Total Existing Structures Footprint Area .1 320 SF 1,320 SF 8,300 SF 300 SF 3,308 SF 1,300 SF (see below) 13,208 SF New & Under Constructi
ies composition of the island is typical of an east-facing, semi-arid Caribbean island and closely resembles the vegetation found on the east end of St. John and St. Thomas. There are approximately 100 native species present on the island. One species is listed on the Federal or Territorial Endangered Sp
g Structures Currently there are several existing structures on the island making up the residence and its accessory uses. The structures include a Main House with three guest rooms, Master Bedroom, Office Pavilion, Staff Cottage, Mechanical Building, Wood Shop, Gym, Beach Hut, Tiki Hut and several small
that 4 panels be constructed to fit in the 4 arches to stop the wind and rain from entering the patio on the South east portion of the room facing St. John. Outside contractors have supplied a quote of $36000.00 to complete this project as maintenance staff too busy to complete. + NC 24. Wildflowers
Complete. + NC 7. 40 Ft Digital Screen vii) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. 4 Update 8. Main House lutron system not working properly. viii) Completed. 4 4 NC JE to advise 9. Repeaters for MH Cell hone & Radio ix) Repeater costs $4K. Ins
that 4 panels be constructed to fit in the 4 arches to stop the wind and rain from entering the patio on the South east portion of the room facing St. John. Outside contractors have supplied a quote of $36000.00 to complete this project as maintenance staff too busy to complete. + NC 24. Wildflowers
Complete. + NC 7. 40 Ft Digital Screen vii) JE still to advise on proposal received from Larry Jacobson for cinema and drive-in. 4 Update 8. Main House lutron system not working properly. viii) Completed. 4 4 NC JE to advise 9. Repeaters for MH Cell hone & Radio ix) Repeater costs $4K. Ins
cription Description Contracted To Date Balance of Contract w/Retainage r 41,595.00 28,610.35 EFTA00283238 Lassie Corner Stone P.O. Box 1479 St. John, VI 00831 September 2, 2011 Requisition #1 Period through 09/02/11 Payment requested for the installation of 370.99 face feet of stone veneer wal
LSJ CONSTRUCTION Subcontractor Payout Project: Main House #1011 Trade: Stone Veneer Subcontractor Gassie Corner Stone Invoice # Phase # Requisition #01 04-450 Original Budget Sum: Change Orders Subm
Entities connected to both St. John and Main House

Jeffrey Epstein
PERSON
Richard Kahn
PERSON
Marc Rich
PERSON
Condoleezza Rice
PERSONDarren Indyke
PERSONDaphne Wallace
PERSON
St. Croix
LOCATION
Lesley Groff
PERSON
Ghislaine Maxwell
PERSON
George W. Bush
PERSON
St Thomas
LOCATION
Oliver Stone
PERSON
Lawrence Krauss
PERSON
Samantha Power
PERSONLeon Black
PERSONBrice Gordon
PERSON
Puerto Rico
LOCATIONRedhook
LOCATIONLarry Visoski
PERSON
Cabana
LOCATION