4
Shared Docs
4
Same-Page
4 / 4
Mentions
Paul Kelly has promised Miles design — no date given. xv) + NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. 4 Update 15. Music Systems / Electrical Cars xvii) Installation for Car # 2 complete.
T lvii) Conference call held 7 Oct betw. Darren, Paul Gandy & others w.r.t. conflicting information — Paul Gandy was supposed to have memo sent to Darren w.r.t what was excluded and what needs to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second confe
aul Kelly has promised Miles design — no date given. xv) .* NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. > Update 15.Music Systems / Electrical Cars xvii) Installation for Car # 2 complete. x
. lvii) Conference call held 7 Oct betw. Darren, Paul Gandy & others w.r.t. conflicting information — Paul Gandy was supposed to have memo sent to Darren w.r.t what was excluded and what needs to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second confe
.00 - see attached "A*". JE to please advise. + NC 13. Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. EFTA00577814 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM
g. Iv) Conference call held 7 Oct betw. Darren, Paul Gandy & others w.r.t. conflicting information — Paul Gandy was supposed to have memo sent to Darren w.r.t what was excluded and what needs to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second confe
0.00 - see attached "A*". JE to please advise. + NC 13.Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. + NC 14. Poly Pavement Dust Prevention xv) Process on hold whilst
g. Iv) Conference call held 7 Oct betw. Darren, Paul Gandy & others w.r.t. conflicting information — Paul Gandy was supposed to have memo sent to Darren w.r.t what was excluded and what needs to be included in the cable installation proposal. Due to be received by Darren today (11/10) and on second confe
Entities connected to both Miles and Darren w.r.t

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSON
Prince Charles
PERSON
Alan Dershowitz
PERSON
Marc Rich
PERSON
Robert Gates
PERSON
Puerto Rico
LOCATION
Oliver Stone
PERSONDarren Indyke
PERSONLarry Visoski
PERSONPinto
PERSON
Hawaii
LOCATIONBastion
ORGANIZATIONPascal
PERSON
Zorro
LOCATION
West Palm Beach
LOCATIONMiller Bonded
ORGANIZATIONAC Units
ORGANIZATIONEvelyn
PERSONSerge
PERSON