5
Shared Docs
5
Same-Page
5 / 5
Mentions
Paul Kelly has promised Miles design — no date given. xv) + NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. 4 Update 15. Music Systems / Electrical Cars xvii) Installation for Car # 2 complete.
hree 71/4 x 101/4 - not started + NC - old apt 10.Metal door @ entrance - JE wants a door code xv) Building to meet to discuss + NC + 11.Paint Boudoir walls and loo + change carpet xvi) Chaser sent to Jean + NC + Light Chinese tapestry xvii) Chaser sent to Jean + First aid This is to be fou
very of transformers + all other electrical stuff. Conduit has arrived. This project will not start as originally stated due to the shipping delay. Miles believes that it will start mid-Dec. 13/12 Material still not on island due to shipping delay + + Update JE plse advise 8. Maintenance & Stora
12/12 - No pictures chosen for the Indian heads round end of the living room — advised that JE still needs to choose pictures. + Update 9. Paint Boudoir walls and loo + change carpet 13/12 — Fax sent to Jean on 3rd Dec advising that the paint should be more pastel and the shapes should be more sub
aul Kelly has promised Miles design — no date given. xv) .* NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. > Update 15.Music Systems / Electrical Cars xvii) Installation for Car # 2 complete. x
hree 71/4 x 101/4 - not started + NC - old apt 10.Metal door @ entrance - JE wants a door code xv) Building to meet to discuss + NC + 11.Paint Boudoir walls and loo + change carpet xvi) Chaser sent to Jean + NC + Light Chinese tapestry xvii) Chaser sent to Jean + First aid This is to be fou
.00 - see attached "A*". JE to please advise. + NC 13. Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. EFTA00577814 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM
Three 71/4 x 101/4 - not started + NC — old apt 9. Metal door @ entrance - JE wants a door code xiv) Building to meet to discuss + NC 10.Paint Boudoir walls and loo + change carpet xv) Chaser sent to Jean + NC 11. Light Chinese tapestry xvi) Chaser sent to Jean + 12. First aid xvii) This is
0.00 - see attached "A*". JE to please advise. + NC 13.Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. + NC 14. Poly Pavement Dust Prevention xv) Process on hold whilst
Three 71/4 x 101/4 - not started > NC — old apt 9. Metal door @ entrance - JE wants a door code xiv) Building to meet to discuss > NC 10.Paint Boudoir walls and loo + change carpet xv) Chaser sent to Jean + NC 11. Light Chinese tapestry xvi) Chaser sent to Jean + 12. First aid xvii) This is
Entities connected to both Miles and Boudoir

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSON
Prince Charles
PERSON
George W. Bush
PERSON
Alan Dershowitz
PERSON
Marc Rich
PERSONLeon Black
PERSON
Robert Gates
PERSON
Puerto Rico
LOCATION
Eric Trump
PERSON
Oliver Stone
PERSONDarren Indyke
PERSONLarry Visoski
PERSONPinto
PERSONPascal
PERSONSerge
PERSONJE sd
ORGANIZATIONBastion
ORGANIZATIONValdson Cotrin
PERSON
Zorro
LOCATION