l to avoid any liability claims for injury caused by the water getting too hot. To increase the temp further would require extensive alterations. Is Miles to go ahead? viii) The plans calling for a wooden gym have been altered to allow for the use of cement floors and walls. JE would like the outer
salt pond aspect appears to be dead". 6. Ed Tuttle — to supply design of beach house pool design. NS sent a further fax on the 6th September to Mr Tuttle. Same Salt Pond Dock Items to purchase Same 7. Refer to letter sent by Kevin Qualls to Miller regarding the time lines for the pool and tempor
Paul Kelly has promised Miles design — no date given. xv) + NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. 4 Update 15. Music Systems / Electrical Cars xvii) Installation for Car # 2 complete.
so contacted Alan Stopec for his advice. + Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. 4 NC 42. Permits lii) No progress to report — ongoing. + Update 43. New Development liii) Generator for new
very of transformers + all other electrical stuff. Conduit has arrived. This project will not start as originally stated due to the shipping delay. Miles believes that it will start mid-Dec. 13/12 Material still not on island due to shipping delay + + Update JE plse advise 8. Maintenance & Stora
speak to P. Kelly P Kelly has not returned Miles calls for 3 weeks. Perhaps with all the changes to the maintenance building that JE is planning w/Tuttle if the shed has not started manufacturing should it be cancelled? 13/12 — Plans are now on island. JE to advise if order must be cancelled. + NC
aul Kelly has promised Miles design — no date given. xv) .* NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. > Update 15.Music Systems / Electrical Cars xvii) Installation for Car # 2 complete. x
so contacted Alan Stopec for his advice. + Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 42. Permits Iii) No progress to report — ongoing. + Update 43. New Development liii) Generator for new
.00 - see attached "A*". JE to please advise. + NC 13. Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. EFTA00577814 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM
o contacted Alan Stopec for his advice. + Update 40. Dock Light lvii) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 41. Permits lviii) No progress to report — ongoing. ******************** EFTA00577820
0.00 - see attached "A*". JE to please advise. + NC 13.Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. + NC 14. Poly Pavement Dust Prevention xv) Process on hold whilst
FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 40. Dock Light lvii) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 41. Permits (viii) No progress to report — ongoing. + NC 41.Madison Cox to show pictures lix) No progres
Entities connected to both Miles and Tuttle

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSON
Prince Charles
PERSON
George W. Bush
PERSON
Marc Rich
PERSON
Alan Dershowitz
PERSON
Robert Gates
PERSON
Puerto Rico
LOCATION
Oliver Stone
PERSONDarren Indyke
PERSON
Virginia Giuffre
PERSON
New York
LOCATIONLarry Visoski
PERSON
St Thomas
LOCATIONPinto
PERSON
Michael Cohen
PERSONPascal
PERSONCathy
PERSON
Department of Justice
ORGANIZATION
Zorro
LOCATION