e front. Quote expected April 18. 12 EFTA00577594 LITTLE ST. JEFF'S STATUS ITEM COMMENT + NC I. Fixed Roof Yoga Deck i) Awaiting permits. Miles understands that there has been no movement with finalizing this project. + Update 2. Telephone system ii) Telephone system. The low audio is ca
MMENT 4 Update 1. AC in master bedroom. Air volume to be increased and diffusers to be changed. i) Diffusers will begin installation 15 April. Serge was told the AC does not heat the room below 72 degrees. In conjunction with the new apartment, the air conditioner in the MBR will be looked into.
Paul Kelly has promised Miles design — no date given. xv) + NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. 4 Update 15. Music Systems / Electrical Cars xvii) Installation for Car # 2 complete.
r work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update + + 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update + 14.5 x
e front. Quote expected April 18. 12 EFTA00577644 LITTLE ST. JEFF'S STATUS ITEM COMMENT + NC I. Fixed Roof Yoga Deck i) Awaiting permits. Miles understands that there has been no movement with finalizing this project. + Update 2. Telephone system ii) Telephone system. The low audio is ca
MMENT 4 Update 1. AC in master bedroom. Air volume to be increased and diffusers to be changed. i) Diffusers will begin installation 15 April. Serge was told the AC does not heat the room below 72 degrees. In conjunction with the new apartment, the air conditioner in the MBR will be looked into.
very of transformers + all other electrical stuff. Conduit has arrived. This project will not start as originally stated due to the shipping delay. Miles believes that it will start mid-Dec. 13/12 Material still not on island due to shipping delay + + Update JE plse advise 8. Maintenance & Stora
om — JE says AC is broken — a/c cuts off after 30 mins. ii) 13/12 — Diffusers need to be changed. The diffusers need to be specifically made and Serge will be contacting GM wk of 16 Dec to discuss this. + Update 3. Safe iii) 13/12 — Further delayed from 18 Nov — expecting to install by mid-Dec
aul Kelly has promised Miles design — no date given. xv) .* NC 14.Poly Pavement Dust Prevention xvi)Process on hold whilst gym is being erected. Miles continues to spray roads with water to ease dust levels. > Update 15.Music Systems / Electrical Cars xvii) Installation for Car # 2 complete. x
r work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update + + 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update + 14.5 x
.00 - see attached "A*". JE to please advise. + NC 13. Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. EFTA00577814 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM
m Pinto expected 15 Nov EFTA00577803 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 14.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update 15.5 x B/W
0.00 - see attached "A*". JE to please advise. + NC 13.Maintenance & Storage Shed xiv) Shed is on order and delivery of building expected 1 Nov. Miles received no drawings yet. Paul Kelly has promised Miles design — no date given. + NC 14. Poly Pavement Dust Prevention xv) Process on hold whilst
ule for work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update I4.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to approve first - windows will take 8 wks from approval + Update 15.5 x B/W
Entities connected to both Miles and Serge

Jeffrey Epstein
PERSON
Ghislaine Maxwell
PERSON
George W. Bush
PERSON
Alan Dershowitz
PERSON
Marc Rich
PERSON
Prince Charles
PERSONLeon Black
PERSON
Donald Trump
PERSON
Joe Biden
PERSON
Prince Andrew
PERSON
Bill Clinton
PERSON
Puerto Rico
LOCATION
Eric Trump
PERSON
Robert Gates
PERSON
Samantha Power
PERSONDarren Indyke
PERSON
John F. Kennedy
PERSON
Sergey Brin
PERSON
Oliver Stone
PERSON
Julie K. Brown
PERSON