3
Shared Docs
3
Same-Page
3 / 3
Mentions
ding 2016 CERTIFIED TRUE AND CORRECT BY WDENCE ROMNEY TAX COLLECTOR °CA_ terJRE 6/28/2017 DATE EF
ment of Existing Structure O Description of Activity R.2.41kek2.(1* iCt rerliCVS "Ann it, v epu--\ \AN -‘,45 JJ x`11 2. Base Flood Elevation at the Development Site is N R. above mean sea level (mu) . 3. Elevation of the First Floor Basement or Flood proof level for proposed structure is U. A. 4. Describe
ing 2016 CERTIFIED TRUE AND CORRECT BY LUDENCE ROMNEY TAX COLLECTOR SIGNATURE 6/28/2017 DATE EFTA0
of Existing Structure O Description of Activity ree-Dicerk.--4/ - fn 1/4 i calicAcs. /.4‘viviivo'iy5 'it 64.0<-0,1 2. Base Flood Elevation at the Development Site is 93 A. above can sea level (oui) • 3. Elevation of the First Floor, Basement or Flood proof level for proposed structure is 1 2_ 4. Descr
ing 2016 CERTIFIED TRUE AND CORRECT BY LUDENCE ROMNEY TAX COLLECTOR ,C1L 7-nATURE 11/04/2016 DATE
ovement of Existing Structure K Description of Activity cosuomoncianA0anOxt a TeWerf an. Lard.gGroan Mon 0cckleroP Wong 2. Base Flood Elevation at the Development Site is n1a ft. above mean sea level (msl). 3. Elevation of the First Floor, Basement or Flood proof level for proposed structure is WEI 4. Describe
Entities connected to both Mitt Romney and the Development Site

Charlotte Amalie
LOCATIONOffice of the Tax Collector
ORGANIZATIONReal Property Tax
ORGANIZATIONRecorder Of Deeds
ORGANIZATIONPlanning & Natural Resources
ORGANIZATIONLand Uses
ORGANIZATIONLUDENCE ROMNEY
ORGANIZATIONSignature of Applicant
ORGANIZATIONJAMES ISLAND
LOCATIONGREAT ST
ORGANIZATIONa Costal Zone Management Permit
ORGANIZATION3 Family
ORGANIZATIONfora R-2
LOCATIONComplete
ORGANIZATIONHome Tel
ORGANIZATIONVe or
ORGANIZATIONVI-V30
ORGANIZATIONthe First Floor, Basement
ORGANIZATION
KJAER
ORGANIZATIONOSBERT E. POTTER
PERSON