f February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Provide full architectural services for a new single-family residence of approximately 10,000 square feet and
t limited to, asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic substances. 9.10 WCI shall retain the right to photograph the Project for a minimum period of one (1) year after construction is complete and publish any part or the entire Project in perpetuity. ARTICLE 10 PAYMENTS
f February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set forth below. TERMS AND CONDITIONS OF AGREE
t limited to, asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic substances. 9.10 WCI shall retain the right to photograph the Project for a minimum period of one (1) year after construction is complete and publish any part or the entire Project in perpetuity. ARTICLE 10 PAYMENTS
f February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set forth below. TERMS AND CONDITIONS OF AGREE
t limited to, asbestos, asbestos products, polychlorinated biphenyl (PCB) or other toxic substances. 9.10 WCI shall retain the right to photograph the Project for a minimum period of one (1) year after construction is complete and publish any part or the entire Project in perpetuity. ARTICLE 10 PAYMENTS
Entities connected to both San Diego and the Project

Jeffrey Epstein
PERSON
George W. Bush
PERSONthe American Arbitration Association
ORGANIZATIONWALLACE
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONEnvironmental Consultants
ORGANIZATIONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATION