f February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Provide full architectural services for a new single-family residence of approximately 10,000 square feet and
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
f February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set forth below. TERMS AND CONDITIONS OF AGREE
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
f February in the year of Two Thousand and 15. BETWEEN the Owner: Jeffrey Epstein and Wallace E. Cunningham Inc. (WCI): 1111 West Arbor Drive San Diego, CA 92103 For the following Project: Scope of project to be determined. The Owner and WCI agree as set forth below. TERMS AND CONDITIONS OF AGREE
f construction. All submittals shall be reviewed and stamped by the Contractor prior to submittal to WCI. This requirement shall be made a part of the General Conditions of the Contract for Construction. 2.4.13 WCI shall prepare Change Orders and Construction Change Directives, with supporting documentation and data, if authorized or confirmed in w
Entities connected to both San Diego and the General Conditions of the Contract for Construction

Jeffrey Epstein
PERSON
George W. Bush
PERSONthe American Arbitration Association
ORGANIZATIONWALLACE
PERSONReimbursable
PERSONSchematic Design Phase
ORGANIZATIONWALLACE E. CUNNINGHAM
PERSONGuy West
PERSONWallace E. Cunningham Inc.
ORGANIZATIONBasic Services
ORGANIZATIONDesign Documents
ORGANIZATIONDrawings and Specifications
ORGANIZATIONEnvironmental Consultants
ORGANIZATIONthe Contract for Construction
ORGANIZATIONthe Contract Sum
ORGANIZATIONSubstantial Completion
ORGANIZATIONCivil Engineer
ORGANIZATIONMechanical and Plumbing Consultants
ORGANIZATIONElectrical Consultant
ORGANIZATIONProject Data Sheet/Code Analysis
ORGANIZATION