6
Shared Docs
6
Same-Page
6 / 6
Mentions
We are awaiting this. iv) Wireless Network Computer — This has been removed from 7 Is' Street and installed at 656' Street. GM has requested that Pinto prepare coloured boards for the entry hall of 71s' street. We have heard nothing back from Pinto on this. We will chase when the offices open in Se
salt pond aspect appears to be dead". 6. Ed Tuttle — to supply design of beach house pool design. NS sent a further fax on the 6th September to Mr Tuttle. Same Salt Pond Dock Items to purchase Same 7. Refer to letter sent by Kevin Qualls to Miller regarding the time lines for the pool and tempor
TOBER NEW PARIS APT STATUS ITEM COMMENT + NC + 12.JE wants schedule for work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update + + 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to
so contacted Alan Stopec for his advice. + Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. 4 NC 42. Permits lii) No progress to report — ongoing. + Update 43. New Development liii) Generator for new
be more subtle. Carpet will be changed after painting complete. Valdson advises painter had a look at the boudoir and will put forward a proposal. Pinto's office have not yet received the new samples. Expect proposal 16th / 17th Dec. ► NC 10.AC in Kitchen xii) 13/12 - To be reviewed at the time
speak to P. Kelly P Kelly has not returned Miles calls for 3 weeks. Perhaps with all the changes to the maintenance building that JE is planning w/Tuttle if the shed has not started manufacturing should it be cancelled? 13/12 — Plans are now on island. JE to advise if order must be cancelled. + NC
TOBER NEW PARIS APT STATUS ITEM COMMENT + NC + 12.JE wants schedule for work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update + + 13.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to
so contacted Alan Stopec for his advice. + Update 41. Dock Light li) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 42. Permits Iii) No progress to report — ongoing. + Update 43. New Development liii) Generator for new
to Paris NEW PARIS APT STATUS ITEM COMMENT 4 NC 13.JE wants schedule for work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov EFTA00577803 FORTNIGHTLY REPORT FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 14.Change Windows before Winter xix) Serge a
o contacted Alan Stopec for his advice. + Update 40. Dock Light lvii) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 41. Permits lviii) No progress to report — ongoing. ******************** EFTA00577820
OCTOBER NEW PARIS APT STATUS ITEM COMMENT + NC 13.JE wants schedule for work — inc layout, construction and decoration xviii) Proposal from Pinto expected 15 Nov + Update I4.Change Windows before Winter xix) Serge advises bill for work due at Pinto's office Wed 16 Oct — Serge needs to appro
FRIDAY 11 OCTOBER STATUS ITEM COMMENT + Update 40. Dock Light lvii) Ed Tuttle was not consulted on dock light and Charles has now sent memo to Tuttle requesting manufacturer details. + NC 41. Permits (viii) No progress to report — ongoing. + NC 41.Madison Cox to show pictures lix) No progres
Entities connected to both Pinto and Tuttle

Jeffrey Epstein
PERSON
Marc Rich
PERSON
Ghislaine Maxwell
PERSONDarren Indyke
PERSON
Prince Charles
PERSONPascal
PERSONMiles
PERSONValdson Cotrin
PERSON
Zorro
LOCATION
Oliver Stone
PERSON
George W. Bush
PERSON
Robert Gates
PERSON
Puerto Rico
LOCATIONSerge
PERSONBoudoir
LOCATIONLarry Visoski
PERSONEd Tuttle
PERSONJE sd
ORGANIZATION
Alan Dershowitz
PERSONKline
PERSON