3
Shared Docs
3
Same-Page
3 / 3
Mentions
ng engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
k which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide th
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
t Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish t
vities will require in-water monitoring and the cost will be determined by the approved monitoring, mitigation and water quality monitoring plans. Cable Lay Monitoring, including boat, captain, divers, principle, all necessary photographic and sampling equipment (usually more than 8 hours, and early hours) during a
Entities connected to both Paul Ryan and Cable Lay Monitoring

Jeffrey Epstein
PERSON
Bill Clinton
PERSON
Sarah Ferguson
PERSONErika Kellerhals
PERSON
San Juan
LOCATIONRyan Wisehart
PERSONFerguson Kroblin
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
St. Croix
LOCATIONUtilities
ORGANIZATIONVIWAPA
ORGANIZATION
Coastal
LOCATIONthe Coastal Zone
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONHistoric Land
LOCATIONAir Quality
ORGANIZATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATION