3
Shared Docs
3
Same-Page
3 / 3
Mentions
ng engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the cable lay. I will verify with David Brewer of VISHPO if one will be required and if not I will get a l
k which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide th
e project may impact endangered species Formal Section 7 consultation will be required. We will route the cable the best as possible to avoid this. Archeological surveys will probably not be required for the extension of the dock if we decided to go that way or the cable lay. I can ask David Brewer of VISHPO
t Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish t
ruction procedures. If either NMFS or FWS determine that the project may impact endangered species Formal Section 7 consultation will be required. Archeological surveys may be required for the extension of the dock and the new dock structure, the cable should not require an archeological study since it will
Entities connected to both Paul Ryan and Archeological

Jeffrey Epstein
PERSON
Bill Clinton
PERSON
Sarah Ferguson
PERSONErika Kellerhals
PERSON
San Juan
LOCATIONRyan Wisehart
PERSONFerguson Kroblin
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
St. Croix
LOCATIONUtilities
ORGANIZATIONVIWAPA
ORGANIZATION
Coastal
LOCATIONthe Coastal Zone
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONHistoric Land
LOCATIONAir Quality
ORGANIZATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATION