3
Shared Docs
3
Same-Page
3 / 3
Mentions
ng engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to
y well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
k which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide th
to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
t Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish t
o engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Protection Agency (EPA) and a Water Quali
Entities connected to both Paul Ryan and U.S. Army Corps

Jeffrey Epstein
PERSON
Bill Clinton
PERSON
Sarah Ferguson
PERSONErika Kellerhals
PERSON
San Juan
LOCATIONRyan Wisehart
PERSONFerguson Kroblin
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
St. Croix
LOCATIONUtilities
ORGANIZATIONVIWAPA
ORGANIZATION
Coastal
LOCATIONthe Coastal Zone
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONHistoric Land
LOCATIONAir Quality
ORGANIZATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATION