ng engineer or architect. We may be able to have Ryan Wisehart draw what we need and we may be able to
e do not have to go through Section 7. I plan to stay well away from ESA corals. BIOIMPACT, INC. Page 1 EFTA00582899 The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
k which either I or Erika should have. We can get Ryan Wisehart to draw an RO line and I can provide th
We should be able to site the cable so we do not have to go through Section 7. I plan to stay well away from ESA corals. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
t Bioimpact, Inc. is proposing to work with you, Ryan Wisehart and the design engineers to establish t
e to avoid reefs to reduce the potential of having to engage in formal Section 7 consultation with the Federal Agencies. The project will require a Major Coastal Zone Management (CZM) Water Permit., a U.S. Army Corps of Engineers (U.S. ACOE), reviewed by NMFS, Federal Fish and Wildlife Service (FWS) and the Environmental Pr
Entities connected to both Paul Ryan and Major Coastal Zone Management

Jeffrey Epstein
PERSON
Bill Clinton
PERSON
Sarah Ferguson
PERSONErika Kellerhals
PERSON
San Juan
LOCATIONRyan Wisehart
PERSONFerguson Kroblin
PERSONAmy Claire Dempsey
PERSONBioimpact, Inc.
ORGANIZATION
St. Croix
LOCATIONUtilities
ORGANIZATIONVIWAPA
ORGANIZATION
Coastal
LOCATIONthe Coastal Zone
LOCATIONTerrestrial Resources
ORGANIZATIONLandforms, Geology, Soils
ORGANIZATIONHistoric Land
LOCATIONAir Quality
ORGANIZATIONthe Federal Agencies
ORGANIZATIONthe U.S. COE
ORGANIZATION